ELCO Case Study Booklet Condensing Gas Boilers
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
elco<br />
elco<br />
elco<br />
PI<br />
PI<br />
PI<br />
TYPE: Renovations | SECTOR: Sports<br />
Parkstad<br />
Limburg Stadium<br />
Kerkrade, The Netherlands<br />
RESIDENTIAL<br />
OFFICES<br />
Parkstad Limburg stadium in Kerkrade.<br />
The Parkstad Limburg stadium in Kerkrade is Dutch<br />
football club Roda JC's home stadium and has 19,979<br />
seats, 2,500 business seats and 24 skyboxes.<br />
The challenge<br />
For this project the big challenge was placing the boiler in the<br />
stadium. Because the <strong>ELCO</strong> TRIGON® XXL is easily dismantled into<br />
smaller components, transporting and installing it in the boiler room<br />
was possible. The integral cargo wheels made manoeuvring and<br />
positioning the boilers on site easier.<br />
Featured products:<br />
TRIGON® XXL EVO<br />
System schematic<br />
Pomp<br />
Q1<br />
Naar diverse<br />
afnemers<br />
Van diverse<br />
afnemers<br />
The <strong>ELCO</strong> solution<br />
The system has now been running as<br />
expected for some time: Fault-free<br />
and significantly reducing natural gas<br />
consumption.<br />
Thanks to the low-water combustion<br />
technology, in which the heat exchanger<br />
operates with a minimum amount of<br />
water, the warm-up time is fast. In fact, the<br />
TRIGON® XXL EVO needs only 30 seconds<br />
to reach room temperature.<br />
HOTELS / MALLS<br />
Comment<br />
During the construction of the stadium, the boilers were lifted inside.<br />
This was only made possible due to the boiler's ability to be<br />
dismantled and then reassembled once on site. The end result<br />
was a high quality, energy efficient heating system in a cascade<br />
arrangement. The new boilers are responsible for powering the<br />
stadium's pitch heating system, the hot water for the showers and<br />
swimming pool, plus heating for the offices and public lounges.<br />
TRIGON® XXL condensing boilers offer top<br />
performance and can reach outputs up to<br />
2 MW, thanks to a unique design. When<br />
mounted in cascade, the TRIGON® XXL<br />
boilers can reach a total output of 32 MW.<br />
Pomp<br />
Q1<br />
Pomp<br />
Q1<br />
EDUCATION / SPORTS<br />
High efficiency & low emissions<br />
Compact size and powerful output power<br />
Unique heat exchanger with HEX³ geometry<br />
for class leading NOx and CO emissions<br />
Robust stainless steel heat exchanger<br />
The plant scheme<br />
3 x TRIGON® XXL EVO 1100<br />
Benefits<br />
TRIGON® XXL EVO 1100<br />
117<br />
litre<br />
Low water<br />
content boiler<br />
22<br />
mg/kWh * 109% **<br />
Extremely low<br />
NOx emissions<br />
(EN15502)<br />
Annual efficiency<br />
(NNG 40/30ºC)<br />
INDUSTRY<br />
44<br />
* (EN15502)<br />
** (In accordance with Equation 2 in the Non-Domestic Building Services<br />
Compliance Guide)<br />
45