I<br />

TYPE: Renovations | SECTOR: Education<br />

Annastift<br />

Living and Education<br />

Hanover, Germany<br />

The <strong>ELCO</strong> solution<br />

The heating system requires a delta T of<br />

30K and at the same time a high systemside<br />

water pressure of 6 bar due to the<br />

building's height. Furthermore, only two<br />

chimney flues with a height of 42m were<br />

available. Here, the TRIGON® XL was able<br />

to demonstrate its full performance and<br />

robustness. Coupled with <strong>ELCO</strong>'s HEX³<br />

stainless steel heat exchanger and the<br />

low flue gas emissions, a long-lasting and<br />

efficient system was created.<br />

OFFICES<br />

System schematic<br />

RESIDENTIAL<br />

Achtung !<br />

Es handelt sich nur um eine Prinzipskizze. Sicherheitstechnische Einrichtungen wie<br />

Armaturen etc. sind zu erganzen.<br />

Innovative new central heating system<br />

powered by <strong>ELCO</strong> boilers.<br />

Annastift Living and Education ensures comprehensive<br />

educational, vocational and social rehabilitation for<br />

people with disabilities in Hanover, especially those<br />

with physical disabilities.<br />

From the heating centre in the basement of the<br />

16-storey building, the surrounding properties are<br />

supplied with heat.<br />

The challenge<br />

The existing boiler was defective and leaking. Therefore, the<br />

defective 2,300kW boiler had to be replaced at short notice, while<br />

the remaining 2,300kW boiler also had to be renewed. A CHP<br />

(combined heat and power) with an electrical output of 300kW<br />

remains installed in the central heating system, which should be<br />

hydraulically integrated into the new set-up and optimise running<br />

time. A combination of cramped conditions in the central heating<br />

system, the building's height of over 42m and the integration into<br />

the BMS (GLT) were all issues that had to be overcome.<br />

Comment<br />

The aim was to increase the efficiency of the boiler system in<br />

combination with the CHP unit and ensure reliability. For this<br />

purpose, we focused on a low starting output of the boilers when<br />

selecting the products and put together a cascade comprising<br />

several units. We then compared the TRIGON® XXL and TRIGON®<br />

XL and, together with the heating engineer and the customer, we<br />

decided on a cascade of 8x TRIGON® XL 570 instead of 4x TRIGON®<br />

XXL 1200.<br />

Featured products:<br />

TRIGON® XL<br />

The TRIGON® XL represents a significant<br />

step forward in heating technology.<br />

With extremely flexible configurations,<br />

clever design and a range of models<br />

available, the boiler is perfect for a variety<br />

of commercial applications. Plus, extensive<br />

cascade arrangements of up to 8 boilers<br />

with a combined output of 4,560kW are<br />

possible.<br />

Unique heat exchanger with HEX³<br />

geometry for class leading NOx and<br />

CO emissions<br />

Extremely high efficiency<br />

Robust stainless steel heat exchanger<br />

Low water content boiler<br />

Compact dimensions<br />

Can be easily dismantled and<br />

reassembled onsite<br />

The plant scheme<br />

8 x TRIGON® XL 570<br />

COM - Gateway for connecting the boilers to the building<br />

management system via the BAC-Net bus system<br />

Benefits<br />

TRIGON® XL 570<br />

Ventil<br />

01<br />

Pumpe I---,<br />

01 A I<br />

W I<br />

elco<br />

<br />

LPBr--<br />

---Bus- --<br />

TRIGON ® XL<br />

I<br />

I--- 7<br />

Pumpe A I<br />

01 M<br />

elco<br />

<br />

LPB­<br />

Bus<br />

LPB- ---Bus --<br />

Nur zur Illustration, keine Planungsgrundlage!<br />

Customized Solution<br />

Hohenzollernstr. 31<br />

D-72379 Hechingen<br />

82<br />

litres<br />

For single boiler<br />

heat exchanger<br />

Gezeichnet:<br />

Gepruft:<br />

R.S.<br />

I<br />

I--- 7<br />

Pumpe<br />

01 A I<br />

M<br />

elco<br />

<br />

I<br />

I---7<br />

Pumpe A I<br />

01 M<br />

)<br />

elco<br />

Datum: 16.08.2023<br />

Anderungsdatum:<br />

I<br />

Pumpe 1----,<br />

01 A I<br />

W I<br />

elco 8<br />

I<br />

I---7<br />

Pumpe A I<br />

01 M<br />

)<br />

elco<br />

LPB-<br />

----Bus ___<br />

TRIGON ® XL TRIGON ® XL TRIGON ® XL<br />

LPB-<br />

---Bus __ _<br />

TRIGON ® XL TRIGON ® XL TRIGON ® XL TRIGON ® XL<br />

31<br />

mg/kWh<br />

NOx level<br />

(annual emission<br />

EN15502)<br />

110.3%<br />

Annual efficiency<br />

(NNG 40/30ºC)<br />

Bezeichnung:<br />

Status:<br />

---- , ----<br />

L __ ,<br />

Pumpe<br />

01 I<br />

<br />

elco<br />

( )<br />

I<br />

I<br />

---- ----L-----<br />

,<br />

Pumpe r---,<br />

01 © :<br />

elco (<br />

Zeichenblatt - BVH BVH Annastift<br />

, I T<br />

//<br />

BacNeUModbud<br />

zur bauseitigen<br />

GLT-Anlage<br />

Zur bauseitigen<br />

Hydraulik<br />

0-10V Signal<br />

van bauseitiger<br />

GLT-Anlage<br />

COM<br />

GATEWAY<br />

___ Jiil<br />

<br />

---------------------------r-­<br />

___________________________ 1<br />

Ausarbeitung Seite: 2 van: 26 elco<br />