20.02.2024 Views

ELCO Case Study Booklet Gas Boilers

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

system detekcji gazu<br />

LMS14<br />

LMS14<br />

AVS_1<br />

AVS_2<br />

AVS_3<br />

OZW<br />

LMS14<br />

AVS_1<br />

AVS_2<br />

AVS_3<br />

ZASILANIE GŁÓWNE<br />

Zapotrzebowanie na moc = 1440 kW<br />

3<br />

Strumień przepływu czynnika = 62 m/h<br />

Parametry czynnika Tz/Tp = 70°C/50°C<br />

TYPE: New Build | SECTOR: Hotels<br />

Platinum Mountain<br />

Hotel & Spa<br />

Szklarska Poręba, Poland<br />

OFFICES<br />

System schematic<br />

RESIDENTIAL<br />

16<br />

7<br />

Multi-family building powered by<br />

<strong>ELCO</strong> boilers.<br />

The Platinum Mountain property is a 5-star resort complex<br />

comprising the main hotel and adjoining apartment<br />

buildings. The hotel building has 137 rooms<br />

for approximately 400 guests.<br />

Featured products:<br />

TRIGON® XL<br />

DN200<br />

BUFOR GAZU<br />

11<br />

12<br />

DN65<br />

DN100<br />

1<br />

230-400 V<br />

16 A<br />

OCI345<br />

DN100<br />

230-400 V<br />

16 A<br />

3 3<br />

DN100<br />

8<br />

10 9<br />

8<br />

DN100<br />

11<br />

12<br />

DN65<br />

OCI345<br />

1<br />

DN100<br />

DN100<br />

8<br />

10 9<br />

8<br />

DN100<br />

11<br />

12<br />

DN65<br />

230-400 V<br />

16 A<br />

OCI345<br />

1<br />

DN150<br />

DN150<br />

3<br />

DN100<br />

8<br />

DN200<br />

DN150<br />

10 9<br />

8<br />

DN100<br />

DN50<br />

2<br />

NEUTRALIZATOR<br />

KONDENSATU<br />

2<br />

DN200<br />

Sprzęgło hydrauliczne Termen SP125/250, Q=29,2 m³/h<br />

13 14 14<br />

6<br />

15<br />

13<br />

OBIEG NR 1<br />

14 14<br />

4 5<br />

DN150<br />

DN150<br />

OZNACZENIA<br />

2 Naczynie wzbiorcze Reflex 1000N<br />

3 Zawór bezpieczeństwa 1 1/4 4 bar<br />

4 Sprzęgło hydrauliczne Aulin ASH 250/600 - króćce DN200<br />

5<br />

Filtr odmulnik Aulin FOM 150<br />

7 separator powietrza Flexvent MAX 3/4"<br />

8 Zawór klapowy DN100<br />

9 Zawór zwrotny międzykołnierzowy DN50<br />

10 Zawór klapowy DN50<br />

11 Zawór kulowy DN50 - GAZ<br />

12 Filtr siatkowy DN50 - GAZ<br />

13 Zawór klapowy DN200<br />

14 Zawór klapowy DN150<br />

Oznaczenia<br />

instalacja C.O. - powrót<br />

instalacja C.O. - zasilanie<br />

1 Kocioł gazowy kondensacyjny firmy Elco, typ Trigon XL 500<br />

6<br />

Pompa obiegowa WILO IP-E 80/105-3/2 PN10<br />

15 Zawór zwrotny międzykołnierzowy DN150<br />

16 Zawór elektomagnetyczny systemu GAZEX DN125<br />

INSTALACJA POZA ZAKRESEM OPRACOWANIA<br />

HOTELS / MALLS<br />

The challenge<br />

Surrounding the hotel are independent apartment buildings with 333<br />

guest suites (each for a minimum of 4 people). There are 10 independent<br />

boiler rooms in the complex: The main room in the hotel building<br />

houses 3 x TRIGON® XL 570 boilers. The intermediate room provides<br />

heating and hot water for 3 apartment buildings using 2 x TRIGON® XL<br />

500 units, while there are another 8 cascade boiler rooms fitted with<br />

THISION® L ECO 70 boilers.<br />

The main building boasts extensive spa facilities and a swimming pool<br />

area with high energy demand in terms of both central heating and the<br />

large amounts of hot water required.<br />

Comment<br />

The building is constructed to a very high standard and has many high<br />

quality facilities for visitors and guests to use.<br />

There were very high specification requirements for the heating and<br />

hot water system, as well as a greater emphasis on after-sales service,<br />

maintenance and support.<br />

<strong>ELCO</strong> boilers fit in perfectly with these requirements, due to their high<br />

levels of reliability and energy efficiency, expertly supported by the<br />

company's qualified service staff.<br />

The TRIGON® XL represents a significant<br />

step forward in heating technology.<br />

With extremely flexible configurations,<br />

clever design and a range of models<br />

available, the boiler is perfect for a variety<br />

of commercial applications. Plus, extensive<br />

cascade arrangements of up to 8 boilers<br />

with a combined output of 4,560kW are<br />

possible.<br />

Unique heat exchanger with HEX³<br />

geometry for class leading NOx and<br />

CO emissions<br />

Extremely high efficiency<br />

Robust stainless steel heat exchanger<br />

Low water content boiler<br />

Compact dimensions<br />

Can be easily dismantled and<br />

reassembled onsite<br />

The plant scheme<br />

3 x TRIGON® XL 570 (installed in cascade)<br />

2 x TRIGON® XL 500 (installed in cascade)<br />

2 x THISION® L ECO 70 - 6 KPL (installed in cascade)<br />

3 x THISION® L ECO 70 (installed in cascade)<br />

2 x THISION® L ECO 100 (installed in cascade)<br />

Benefits<br />

TRIGON® XL 570<br />

82<br />

litres<br />

For single boiler<br />

heat exchanger<br />

THISION® L ECO<br />

113.9%<br />

Annual efficiency<br />

(NNG 40/30ºC)<br />

** Cascade of 2 boilers<br />

THISION® L ECO 100<br />

31<br />

mg/kWh<br />

NOx level<br />

(annual emission<br />

EN15502)<br />

110.3%<br />

Annual efficiency<br />

(NNG 40/30ºC)<br />

EDUCATION / SPORTS<br />

INDUSTRY<br />

26<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!