20.02.2024 Views

ELCO Case Study Booklet Condensing Gas Boilers

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

elco<br />

elco<br />

TYPE: Renovations | SECTOR: Residential<br />

Twekkelerveld Residential<br />

Care Centre<br />

Enschede, The Netherlands<br />

OFFICES<br />

RESIDENTIAL<br />

The <strong>ELCO</strong> solution<br />

No concrete savings figures are available<br />

yet, but expectations are that the current<br />

installation is a lot more economical.<br />

Complete replacement of the heating<br />

system during the Christmas holiday<br />

season.<br />

The complex consists of 140 residential units and also has<br />

several facilities such as a Grand Café, supermarket and<br />

hair salon.<br />

Featured products:<br />

TRIGON® XL<br />

System schematic<br />

PI<br />

PI<br />

HOTELS / MALLS<br />

The challenge<br />

Speed was the main priority, as the previous heating system had to<br />

be replaced quickly due to failure and repair proved impossible. It<br />

was vital to get a new system fitted to ensure residents did not go<br />

without heating and hot water.<br />

Comment<br />

As the old boilers failed during the coldest period of the year and<br />

the holidays were approaching, the care centre had to act quickly<br />

in sourcing and installing a replacement heating system.<br />

Thanks to <strong>ELCO</strong>, the new TRIGON® XL boilers were successfully<br />

installed in just two days.<br />

The TRIGON® XL incorporates the finest engineering and<br />

components to offer high quality levels of power and performance.<br />

It achieves low NOx emissions by utilising a premix burner system<br />

alongside a stainless steel heat exchanger. As a result, residents<br />

at the care centre now enjoy comfortable levels of heat as well as<br />

exceptional energy efficiency.<br />

The TRIGON® XL represents a significant step<br />

forward in heating technology.<br />

With extremely flexible configurations, clever<br />

design and a range of models available, the<br />

boiler is perfect for a variety of commercial<br />

applications. Plus, extensive cascade<br />

arrangements of up to 8 boilers with a<br />

combined output of 4,560kW are possible.<br />

Unique heat exchanger with HEX³ geometry<br />

for class leading NOx and<br />

CO emissions<br />

Extremely high efficiency<br />

Robust stainless steel heat exchanger<br />

Low water content boiler<br />

Compact dimensions<br />

Can be easily dismantled and reassembled<br />

onsite<br />

TRIGON ® XL<br />

The plant scheme<br />

2 x TRIGON® XL 200<br />

A complete service<br />

Pomp<br />

Q1<br />

Future-proof. When choosing this installation,<br />

the replacement of the existing front burner<br />

was taken into account.<br />

Pomp<br />

Q1<br />

Benefits<br />

TRIGON ® XL<br />

TRIGON® XL 200<br />

31<br />

litres<br />

For single boiler<br />

heat exchanger<br />

28<br />

mg/kWh<br />

NOx level<br />

(annual emission<br />

EN15502)<br />

110.4%<br />

Annual efficiency<br />

(NNG 40/30ºC)<br />

EDUCATION / SPORTS<br />

INDUSTRY<br />

18<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!