Pittwater Life January 2024 Issue
LOCAL GUIDE: 193 THINGS TO DO 1991‘DEVELOPMENT ONSLAUGHT’ FEARS / BEACHES ACHIEVERS HOLIDAY CROSSWORD + PUZZLES / BARRENJOEY BOATSHED THE WAY WE WERE / HOT PROPERTY / SEEN... HEARD... ABSURD...
LOCAL GUIDE: 193 THINGS TO DO
1991‘DEVELOPMENT ONSLAUGHT’ FEARS / BEACHES ACHIEVERS
HOLIDAY CROSSWORD + PUZZLES / BARRENJOEY BOATSHED
THE WAY WE WERE / HOT PROPERTY / SEEN... HEARD... ABSURD...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Editorial<br />
Wakehurst works in sync<br />
We hear NB Council is making<br />
headway negotiating<br />
with Transport for NSW to<br />
co-ordinate State-led safety<br />
upgrade work on the Wakehurst<br />
Parkway with Council’s flood<br />
improvements agenda.<br />
As reported last month, the<br />
NSW Government is about to<br />
commence $150m of blackspot<br />
safety upgrades along the<br />
Parkway, include two lanes<br />
of roadway from Oxford Falls<br />
Road to Frenchs Forest Road.<br />
Meanwhile Council’s project<br />
aims to reduce the frequency<br />
of flooding at four locations<br />
– Oxford Falls Road West, The<br />
Bends, Sydney Academy of<br />
Sport and Wakehurst Parkway<br />
at Oxford Falls.<br />
Council concedes that given<br />
the programs are linked, it is<br />
vital that construction is integrated<br />
and delivered efficiently<br />
and cost-effectively, with minimal<br />
impact on the community.<br />
Council says it has progressed<br />
designs and environ-<br />
mental approval for both sites<br />
at Oxford Falls, which will<br />
achieve the required protection<br />
against flooding. Council<br />
has also revised options for<br />
The Bends that reduce harm to<br />
the environment and increase<br />
potential for flood prevention.<br />
Council tells us it will<br />
progress the detailed design,<br />
approvals and procurement<br />
for the Oxford Falls Road West<br />
flood improvement works,<br />
including community consultation,<br />
in the next few months.<br />
Council will also soon progress<br />
the alternative design at<br />
The Bends, including concept<br />
designs, identification of likely<br />
environmental approvals and<br />
community consultation.<br />
Likewise detailed design,<br />
approvals and procurement for<br />
the Sydney Academy of Sport<br />
flood improvement works are<br />
expected to begin later in <strong>2024</strong>.<br />
Readers can follow progress<br />
on Council’s Your Say page.<br />
– Nigel Wall<br />
The Local Voice Since 1991<br />
JANUARY <strong>2024</strong> 3