5361- Kilmainhamwood Compost Facility Extension- EIS<br />

11.575m long, and each ABP treatment tunnel is 7.950m wide and 25.425m long. The existing<br />

<strong>compost</strong>ing <strong>facility</strong> also includes a waste reception area, a <strong>compost</strong> screening area and an odour<br />

abatement area. The gross footprint of the existing <strong>compost</strong>ing buildings and odour abatement area is<br />

approximately 5639m 2 .<br />

An ESB substation building is located adjacent to the <strong>compost</strong>ing <strong>facility</strong> buildings as shown on<br />

Drawing No. 5361-2402. The floor area of this building is approximately 34m 2 .<br />

The existing infrastructure at the site is described in further detail herein.<br />

Plate 1 Existing Kilmainhamwood Compost Facility<br />

2.2 DESCRIPTION OF THE PROPOSED DEVELOPMENT<br />

The <strong>facility</strong> is currently permitted, as per EPA waste licence W0195-01 and its associated Technical<br />

Amendment A (Appendix 2.1), to accept and process 20,800 tonnes of biodegradable waste per<br />

annum. The current <strong>facility</strong> has been operational since September 2006.Thorntons Recycling now<br />

propose to extend the existing <strong>facility</strong> to accept and process up to 40,000 tonnes of biodegradable<br />

waste per annum.<br />

For inspection purposes only.<br />

Consent of copyright owner required for any other use.<br />

Proposed Extensions to Facility Buildings<br />

The current application proposes to extend the existing <strong>facility</strong> buildings in order to provide sufficient<br />

processing capacity for the additional tonnage. It is proposed to construct a 38m x 25m front extension<br />

(approximately 1167m 2 – including a 201m 2 ramp for waste acceptance) on the southwest side of the<br />

existing <strong>facility</strong> and a rear extension 39m x 30m (approximately 1043m 2 ) on the northeast side of the<br />

existing <strong>facility</strong>. The proposed extensions to the <strong>facility</strong> buildings are shown on Drawing No. 5361–<br />

2402 and Drawing No. 5361-2403. The extensions to the buildings will be a steel portal frame design<br />

featuring 3.0m high mass concrete walls and green cladding (to match character of the existing<br />

buildings). The height of the proposed extensions will not be any higher than the existing buildings.<br />