28.12.2012 Views

environmental impact statement kilmainhamwood compost facility ...

environmental impact statement kilmainhamwood compost facility ...

environmental impact statement kilmainhamwood compost facility ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5361- Kilmainhamwood Compost Facility Extension- EIS<br />

13.4.3 Seasonal Adjustment<br />

Figure 13.4 Generated Traffic AM Peak<br />

For inspection purposes only.<br />

Consent of copyright owner required for any other use.<br />

Figure 13.5 Generated Traffic PM Peak<br />

In order to undertake an analysis of the traffic flows, it is necessary to apply a correction factor to<br />

convert the surveyed traffic flows into seasonally adjusted traffic flows to take account of the seasonal<br />

variation that is experienced with traffic surveys. These seasonally adjusted conversion factors were<br />

calculated from data taken from a fixed automatic traffic counter located on the N3 just south of Kells<br />

during 2006. It was found that traffic volumes during the AM and PM peak were higher during March<br />

182<br />

EPA Export 01-06-2010:03:56:01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!