28.12.2012 Views

environmental impact statement kilmainhamwood compost facility ...

environmental impact statement kilmainhamwood compost facility ...

environmental impact statement kilmainhamwood compost facility ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5361- Kilmainhamwood Compost Facility Extension- EIS<br />

traffic count was carried out (3 rd March 2009), 7 HGVs entered and departed from the <strong>facility</strong>. This<br />

figure corresponds closely with the figures estimated in Table 13.1 above and as such the assumptions<br />

appear to be satisfactory.<br />

In addition to traffic related to the delivery of materials to or from the <strong>compost</strong>ing <strong>facility</strong>, the <strong>facility</strong> also<br />

employs 4 full time staff. The proposed extension of the <strong>facility</strong> is expected to increase numbers to 6 full<br />

time staff. It is assumed that staff will arrive during the morning peak and leave during the evening<br />

peak. The total number of additional trips that the <strong>facility</strong> will generate during the AM and PM peak is<br />

shown in Table 13.3 below.<br />

Table 13.3 Additional Peak Hour Trips Generated by the Composting Facility Extension<br />

AM Peak Hour PM Peak Hour<br />

13.4.2 Trip Distribution<br />

Arriving Departing Arriving Departing<br />

Delivery Vehicles 1 1 1 1<br />

Employee Vehicles 2 0 0 2<br />

Based on information provided by Thorntons Recycling, the vast majority of biowaste being delivered to<br />

the site arrives from the south and through Nobber. Similarly, the vast majority of finished <strong>compost</strong><br />

being exported from the site departs to the south and through Nobber. Hence it is assumed that all<br />

additional vehicles (generated by proposed <strong>facility</strong> extension) will be travelling to and from Nobber. This<br />

assumption corresponds with the data produced by the traffic count (3 rd March 2009). From the traffic<br />

survey (conducted at site entrance) it can be seen that this is similarly the case for cars and light<br />

vehicles. Figures 13.2 and 13.3 below show the expected distribution of traffic arriving to and departing<br />

from the development during the AM and PM peaks.<br />

For inspection purposes only.<br />

Consent of copyright owner required for any other use.<br />

180<br />

EPA Export 01-06-2010:03:56:01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!