environmental impact statement kilmainhamwood compost facility ...

environmental impact statement kilmainhamwood compost facility ... environmental impact statement kilmainhamwood compost facility ...

28.12.2012 Views

5361- Kilmainhamwood Compost Facility Extension- EIS FIGURES Figure 1.1 Regional Site Location Map ................................................................................................2 Figure 1.2 Activity Area and Ownership Map .......................................................................................3 Figure 2.1 Location of Landbanks for Application of Finished Compost ............................................33 Figure 4.1 Potential Biowaste Arisings (NE Region) versus ABP Approved Capacity .......................62 Figure 4.2 Potential Biowaste Arisings (NE Region) versus Potential Capacity (Panda Waste) ........63 Figure 4.3 Potential Biowaste Arisings (NE Region) versus Potential Capacity (Organic Gold) ........64 Figure 4.4 Potential Biowaste Arisings (NE Region) versus Potential Capacity (Enrich) ...................64 Figure 4.5 Potential Biowaste Arisings (NE and Dublin Region) versus Potential Capacity...............65 Figure 6.1 Designated Conservation Areas .......................................................................................80 Figure 6.2 Habitat Map.......................................................................................................................81 Figure 8.1 Surface Water and Groundwater Monitoring Locations ....................................................93 Figure 8.2 Bedrock Map.....................................................................................................................97 Figure 8.3 Vulnerability Map ..............................................................................................................98 Figure 9.1 Dust Monitoring Locations...............................................................................................107 Figure 9.2 Aerial Diagram of Kilmainhamwood Compost Facility.....................................................111 Figure 9.3 Predicted Existing Kilmainhamwood Composting Facility Odour Dispersion Modelling Assessment Contour Plots for Scenario 1 (98th Percentile for an Odour Concentration of ≤ 1.5 OuE m-3) ...............................................................................................................134 Figure 9.4 Predicted Existing Kilmainhamwood Composting Facility Odour Dispersion Modelling Assessment Contour Plots for Scenario 1 (99.5th Percentile for an Odour Concentration of ≤ 6 OuE m-3) ..............................................................................................................135 Figure 9.5 Predicted Proposed Kilmainhamwood Composting Facility Odour Dispersion Modelling Assessment Contour Plots for Scenario 2 (98th Percentile for an Odour Concentration of ≤1.50 OuE m-3) ..............................................................................................................136 Figure 9.6 Predicted Proposed Kilmainhamwood Composting Facility Odour Dispersion Modelling Assessment Contour Plots for Scenario 2 (99.5th Percentile for an Odour Concentration of ≤3 OuE m-3) ...............................................................................................................137 For inspection purposes only. Consent of copyright owner required for any other use. Figure 9.7 Comparison between Predicted Odour Emissions from Existing Compost Facility and from Proposed Compost Facility Design at the 98 th Percentile for an Odour Concentration of less than or equal to 1.50 OuE/m 3 . .............................................................................138 Figure 9.8 Comparison between Predicted Odour Emissions from Existing Compost Facility and from Proposed Compost Facility Design at the 99.5 th Percentile for an Odour Concentration of less than or equal to 6.0 OuE/m 3 and less than or equal to 3.0 OuE/m 3 ..... .......................................................................................................................................139 Figure 10.1 Day and night time LAeq values from 2008 and 2009 Annual Environmental Reports..150 Figure 10.2 Day and night time LA90 values from 2008 and 2009 Annual Environmental Reports..151 Figure 11.1 Visual Impact Assessment (Photoplate Locations)......................................................162 Figure 12.1 Archaeological Sites (RMP).........................................................................................172 Figure 13.1 Site Location................................................................................................................177 Figure 13.2 Distribution of Generated Traffic AM Peak ..................................................................181 Figure 13.3 Distribution of Generated Traffic PM Peak ..................................................................181 viii EPA Export 01-06-2010:03:55:49

5361- Kilmainhamwood Compost Facility Extension- EIS Figure 13.4 Generated Traffic AM Peak .........................................................................................182 Figure 13.5 Generated Traffic PM Peak .........................................................................................182 Figure 13.6 2009 Seasonally Adjusted AM Peak Traffic Flows ......................................................183 Figure 13.7 2009 Seasonally Adjusted PM Peak Traffic Flows ......................................................183 Figure 13.8 2010 AM Peak Baseflow Traffic Flows ........................................................................184 Figure 13.9 2010 PM Peak Baseflow Traffic Flows ........................................................................185 Figure 13.10 2025 AM Peak Baseflow Traffic Flows ........................................................................185 Figure 13.11 2025 PM Peak Baseflow Traffic Flows ........................................................................186 Figure 13.12 2010 AM Peak Baseflow + Generated Traffic Flows ...................................................186 Figure 13.13 2010 PM Peak Baseflow + Generated Traffic Flows ...................................................187 Figure 13.14 2025 AM Peak Baseflow + Generated Traffic Flows ...................................................187 Figure 13.15 2025 PM Peak Baseflow + Generated Traffic Flows ...................................................188 For inspection purposes only. Consent of copyright owner required for any other use. ix EPA Export 01-06-2010:03:55:49

5361- Kilmainhamwood Compost Facility Extension- EIS<br />

Figure 13.4 Generated Traffic AM Peak .........................................................................................182<br />

Figure 13.5 Generated Traffic PM Peak .........................................................................................182<br />

Figure 13.6 2009 Seasonally Adjusted AM Peak Traffic Flows ......................................................183<br />

Figure 13.7 2009 Seasonally Adjusted PM Peak Traffic Flows ......................................................183<br />

Figure 13.8 2010 AM Peak Baseflow Traffic Flows ........................................................................184<br />

Figure 13.9 2010 PM Peak Baseflow Traffic Flows ........................................................................185<br />

Figure 13.10 2025 AM Peak Baseflow Traffic Flows ........................................................................185<br />

Figure 13.11 2025 PM Peak Baseflow Traffic Flows ........................................................................186<br />

Figure 13.12 2010 AM Peak Baseflow + Generated Traffic Flows ...................................................186<br />

Figure 13.13 2010 PM Peak Baseflow + Generated Traffic Flows ...................................................187<br />

Figure 13.14 2025 AM Peak Baseflow + Generated Traffic Flows ...................................................187<br />

Figure 13.15 2025 PM Peak Baseflow + Generated Traffic Flows ...................................................188<br />

For inspection purposes only.<br />

Consent of copyright owner required for any other use.<br />

ix<br />

EPA Export 01-06-2010:03:55:49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!