5361- Kilmainhamwood Compost Facility Extension- EIS<br />

Surface water monitoring locations are shown on Figure 8.1. The downgradient surface water<br />

monitoring point is at the <strong>facility</strong> outfall to the drainage ditch. The upgradient surface water monitoring<br />

point is approximately 50m upstream of the <strong>facility</strong> outfall.<br />

Results from existing surface water monitoring points, SW1 (upgradient) and SW2 (downgradient), are<br />

detailed below in Table 8.3 for suspended solids.<br />

Table 8.3 Results from SW1 and SW2 for Suspended Solids<br />

Date<br />

Monitoring<br />

locations<br />

12/2008 03/2009 03/2009 06/2009 09/2009 11/2009<br />

SW 1