Mainstream’s new 2,400m 2 transit freight facility was<br />
constructed in just 5 months, creating cost savings for the<br />
business, and enabling operations to be up and running 4<br />
weeks ahead of schedule.<br />
Mainstream Property Manager John Daley says Fosters was<br />
considered for the job because they were part of the New<br />
Zealand Construction Alliance, with whom Mainstream had<br />
worked to build their Palmerston North depot.<br />
He adds that Fosters won the tender due to their collaborative<br />
approach from the outset.<br />
“Fosters were not the cheapest, nor the most expensive” says<br />
John. “We were simply impressed by how proactive they<br />
were in establishing a relationship and then working through<br />
the tender process. From the get-go, Fosters made it clear<br />
that they would give feedback on the design and areas of<br />
improvement. We welcomed that engagement.”<br />
Fosters knowledge of the area was another key strength,<br />
according to John. “Having an intimate understanding of their<br />
backyard - where and what they were building - they projected<br />
a sense of confidence all the way through.”<br />
The construction agreement was signed in January <strong>2023</strong> and<br />
key materials procured by the end of March, which is when the<br />
construction team broke ground. By the end of August, John<br />
had the keys to the building.<br />
“That turnaround is simply amazing” says John. “I talk to plenty<br />
of people about this job and delivery in five months is unheard<br />
of.<br />
“Fosters are a superb team with an innate ability to manage<br />
stressful situations and deliver solutions, which we very much<br />
appreciated.”<br />
Specific features in the project included installation of pallet<br />
racking, 126 solar panels on the roof, high-end EV charging for<br />
standard and heavy-duty vehicles, rain water collection tanks<br />
for grey water use, and data cabling and security provisions.<br />
“Scheduling contractor work and connectivity added extra<br />
challenges alongside a demanding construction programme,<br />
but Fosters managed it all exceptionally well.<br />
“With their collaborative approach and operational efficiency,<br />
Fosters absolutely exceeded our expectations. We got a highquality<br />
build, delivered ahead of programme and on budget.”<br />