Using long trucks to transport rear doors and bulkheads for<br />

the production of curtainsiders has reduced the number of<br />

transports per week between our production facility in Altenberge<br />

and the supplier by a third.<br />

⅓<br />

of the transports between our plant<br />

and the supplier have been<br />

saved by the use of long trucks.<br />

Water management<br />

Handling conflicting goals<br />

The Russian attack on Ukraine required adaptations<br />

at our plant in Lithuania. Previously, the plant had<br />

produced a large number of vehicles for Russia due<br />

to the geographical proximity. As a result of our<br />

withdrawal from the Russian market, the plant in<br />

Lithuania now increasingly supplies our assembly<br />

plants, such as in Spain, with semi-trailer components,<br />

therefore, securing local jobs in Lithuania. As a<br />

consequence, the transport distance for the<br />

components, which were previously delivered from<br />

our German plant in Vreden, doubled to almost<br />

3,200 kilometres.<br />

To reduce the higher carbon footprint, the components<br />

are transported by rail for more than half<br />

of the distance. This reduces the CO 2<br />

emissions per<br />

transport by 38% in comparison to transport<br />

exclusively via road.<br />

Our water management takes place<br />

at all of our sites in compliance<br />

with the legal requirements. Water is<br />

primarily used in household-type applications. Due to the<br />

style of our production, we do not need any special permits,<br />

for example for handling contaminated water. Water<br />

protection measures have been taken at all locations where<br />

work uses substances hazardous to water.<br />

At the Vreden plant, heavy rainfall in September <strong>2022</strong> resulted<br />

in the joining material being discharged into the nearby<br />

river Berkel. No environmental damage occurred as a result.<br />

The drainage overflow was stopped and the sewage system<br />

was flushed by a suction truck. A rainwater retention basin,<br />

which will be constructed by the municipality in 20<strong>23</strong> / 24,<br />

will help to catch rainwater in a controlled manner in the future.<br />

Further savings potentials for reducing water consumption<br />

will be successively identified as part of the environmental<br />

management systems. In the financial year <strong>2022</strong> / <strong>23</strong>,<br />

30,508 m³ of water was drawn from public suppliers and<br />

29,554 m³ was returned to public suppliers. This represents<br />

a water withdrawal of 5.1 m³ per employee. 3.882 m³ of<br />

the water withdrawal and return took place in the plants in<br />

Spain and Turkey, location is regarded as areas under<br />

water stress. 953 m³ of water were consumed for the ventilation<br />

of the site in Horstmar.<br />

Excluding the Nordwalde, Manchester, Michalovce and Melbourne sites<br />

The plant in Lithuania is increasingly supplying our<br />

assembly plants.<br />

➔ GRI 303-1, 303-2, 303-3, 303-4, 303-5