17.06.2023 Views

Philippe Fournier_Portfolio_2023

Portfolio, Philippe Fournier, 2023. A selection of personal, academic and professional projects in architecture & design. All rights reserved.

Portfolio, Philippe Fournier, 2023. A selection of personal, academic and professional projects in architecture & design. All rights reserved.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ROOF (+6.5m)

LVL 1 (+2.0m)

BEACH (+1.0m)

NORTH ELEVATION

ROOF (+6.5m)

LVL 1 (+2.0m)

BEACH (+1.0m)

SOUTH ELEVATION

ROOF (+6.5m)

LVL 1 (+2.0m)

BEACH (+1.0m)

SECTION

PROGRAMS

SCHEDULE

2

1

NATURAL FILTRATION SYSTEM

1

The first pool filling of each

swimming season will come

from the city grid’s treated

water. After this initial filling

the water will remain in a

closed loop system for the

duration of the season.

2 Grey Water is drained from

pools and hot tub

Grey Water is pumped into

a raised gravel bed with

4

filtration plants and sifted

down through gravity

Grey Water deposits into a

hydrobotanic regeneration

pond with plants that feed on

bacteria and other organic

matter

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!