Under Water

4B Design Studio Final Project

Studio Instructed by Andrew Levitt

proposed location: Toronto Islands, Ontario

typology: recreation centre / swimming facility

Jack Layton

Ferry Terminal

Ferry Path

Building

Lake Ontario

Olympic Island

FLOOD CONTROL

The building is situated on the northernmost

edge of Olympic Island, one of the lowest-lying

areas of Toronto Islands, and thus a great flood

risk. In order to protect the building, It is situated

and built up around the highest contour of the

site (+76m above sea level) with a gabion

retaining wall, which is just above the 100 year

flood line of Lake Ontario (75.7m).

TORONTO ISLANDS MAP

16

N

REINFORCED CONCRETE

PAVERS ON GRAVEL BED

REINFORCED CONCRETE STEPS

LIMESTONE-FILLED

GABION BASKET ANTI-

EROSION RETAINING WALL

W/ PLANTER

100 YR FLOOD

LEVEL

LEVEL 1

+2.00m

GRADE

+1.00m