27.12.2012 Views

Bridport House case study, Willmott Dixon

Bridport House case study, Willmott Dixon

Bridport House case study, Willmott Dixon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Overview <strong>Bridport</strong> <strong>House</strong> is an eight-storey residential tower built for the London<br />

Borough of Hackney. It is the first phase of the regeneration of the local<br />

authority’s Colville Estate. The brief was for 41 socially-rented affordable<br />

homes - the first wave of council housing to be built in Hackney for 45 years<br />

The 1,576m³ building has two main entrances and eight front doors to<br />

the family sized four bedroom maisonettes at ground and first floor. Above<br />

there are 33 one, two and three-bedroom apartments, many of which are<br />

double aspect with generous flat areas, large storage and multiple balconies<br />

and terraces; exceeding GLA space standards.<br />

<strong>Bridport</strong> was entirely constructed from cross-laminated timber (CLT), making<br />

it one of the tallest residential wooden structures in the world and UK’s first<br />

multi-storey to be entirely built of the material – including the ground floor.<br />

The team chose CLT because of its lighter weight: a survey revealed a large<br />

Victorian storm sewer under the site and building around a reinforced<br />

concrete (RC) or structural steel frame would have required significant<br />

extra reinforcement of the foundations to create a building of the<br />

same height. Constructing with CLT was also quicker, taking just 12 weeks<br />

on site, six weeks less than a traditional frame solution. <strong>Willmott</strong> <strong>Dixon</strong> is<br />

probably the leading main contractor delivering CLT projects, having recently<br />

started our eleventh of this type.<br />

The Research Project <strong>Willmott</strong> <strong>Dixon</strong> worked with the Cambridge University Engineering<br />

Department (CUED) Centre for Sustainable Development to calculate<br />

the structure’s embodied energy. The team carried out a comparison of the<br />

materials between CLT and RC frame with available data from manufacturers<br />

and the Inventory of Carbon and Energy (ICE) database.<br />

They found that, had the building been of conventional RC frame, an<br />

additional 892 tonnes of carbon would have been embodied in it. This is<br />

equivalent to 12 years’ worth of energy required to heat and light all<br />

dwellings. When the sequestered carbon was added to the carbon avoided,<br />

the total figure was 2,113 tonnes, provided the timber is reused. This is<br />

equivalent to 29 years of operational energy.<br />

Equipped with this data, the design team successfully negotiated with<br />

Hackney Planning Department to reduce the requirement for onsite<br />

renewable energy provision from 20% to 10%.<br />

Experts have welcomed our research since there is a shortage of credible<br />

information on embodied carbon. As thermal efficiency standards improve<br />

and buildings produce less carbon in operation, embodied carbon becomes<br />

relatively more important.