Figure 5: Typical cable layout on bigger surfaces as tank walls<br />

Prepunched<br />

strapping<br />

Temperature<br />

sensor<br />

Temperature<br />

controller<br />

Figure 6: Fixation device: prepunched steel strap<br />

D Use insulation entry kits, where cable penetrates the metallic<br />

insulation cladding by design. In all other places, where<br />

cable passes through metal sheet like cladding front disks<br />

(e.g. on valves) protective rubber profiles G-02 should be<br />

used to mechanically protect the cable.<br />

3.4 Cutting the heating cable<br />

D Before cutting it, confirm the minimum required length <strong>and</strong><br />

tracing allowances.<br />

D Any change to designed circuit length will change power<br />

output <strong>and</strong> design must be reconfirmed.<br />

D Cut the heating cable to length after it is attached to the<br />

pipe.<br />

10<br />

Cold leads<br />

Heating cable<br />

Junction<br />

box