- Page 1:
SEEDS OF HOPENARGES ABDUL AZIZ
- Page 5:
Approval of the Thesis Book for Fin
- Page 8 and 9:
PROJECT NAME SEEDS OF HOPELOCATION
- Page 10 and 11:
20103section 1Introduction PAGE 15
- Page 13:
1.0SECTION 1INTRODUCTION
- Page 16 and 17:
16
- Page 18 and 19:
18KABUL, AFGHANISTANFig 2
- Page 20 and 21:
pANJSHIR, AFGHANISTANFig 320
- Page 22 and 23: 2.1 Afghan Identity and CulturEAfgh
- Page 24 and 25: CULTURE: MUSICAfghan music comes in
- Page 26 and 27: CULTURE: MUSICThe rise of westerniz
- Page 28 and 29: CULTURE: foodFood is an integral pa
- Page 30 and 31: 30
- Page 32 and 33: 32Fig 12
- Page 34 and 35: Fig 14
- Page 36 and 37: Fig 16HOSPITALITYOne thing that has
- Page 38 and 39: 2.2 The influence in Afghanistan’
- Page 40 and 41: Each pattern woven in the carpet ha
- Page 42 and 43: 42Fig 19
- Page 44 and 45: Fig 20Bamiyan - Land of the Buddhas
- Page 46 and 47: 2.3 Loss of Cultural HeritageMany A
- Page 48 and 49: 2.4 Cultural Imprints After First T
- Page 50 and 51: 50Fig 24
- Page 52 and 53: Afghan Artists now have buried thei
- Page 55 and 56: Loss of Woman’s Freedom3.0
- Page 57 and 58: 3.1 Women’s Condition inthe 1900s
- Page 59 and 60: CITADEL HERAT, AFGHANISTANFig 263.2
- Page 61 and 62: FREEDOM FREEDOMFREEDOM FREEDOMFREED
- Page 63: Fig 2863
- Page 66 and 67: 4.1 Afghan Migration during Invasio
- Page 68 and 69: 4.2 Afghanistan’s and UAEs Relati
- Page 70 and 71: PANJSHIR, AFGHANISTANThe largest Af
- Page 74 and 75: NAME WULIEPOCH CULTURAL CENTERARCHI
- Page 76 and 77: 5.1
- Page 78 and 79: ARCHITECT ATELIER ALTER ARCHITECTSL
- Page 80 and 81: 80Fig 35
- Page 82 and 83: 82Fig 37
- Page 84 and 85: APPROACHThe project interprets natu
- Page 86 and 87: PROGRAM1. Main Entrance2. Courtyard
- Page 88 and 89: PROGRAM INVESTIGATIONFig 4188
- Page 90 and 91: ADMINISTRATION PROGRAMLEISURE PROGR
- Page 92 and 93: 92
- Page 94 and 95: FIRST FLOOR PLANFig 48SECOND FLOOR
- Page 96 and 97: ROOF PLAN CICULATIONFig 52Sloping D
- Page 98 and 99: STRUCTURE AND GRIDFig 54FIRST FLOOR
- Page 100 and 101: 100Fig 57
- Page 102 and 103: SITEA huge “urban living room”f
- Page 104 and 105: The building is conceived as a loop
- Page 106 and 107: 106Fig 63
- Page 108 and 109: CONTINUITY OF THE LINEAR PROMENADEP
- Page 110 and 111: 110Fig 69
- Page 113 and 114: 5.3CASE STUDIESCASE STUDIES OF CULT
- Page 115 and 116: PROJECT DESCRIPTIONThe new location
- Page 117 and 118: Fig 74PORTLAND JAPANESE CULTURAL VI
- Page 119 and 120: SITE OF THE PROJECTThe project rein
- Page 121 and 122: Fig 78121
- Page 123 and 124:
Fig 80VISIONA trio of buildings clu
- Page 125 and 126:
MAIN GATEFig 82125
- Page 127 and 128:
MASTER PLANFig 84127
- Page 129 and 130:
materials usedWhile natural wood fo
- Page 131 and 132:
SUSTAINABILITYThe custom metal roof
- Page 133 and 134:
ADMINISTRATION PROGRAMLEISURE PROGR
- Page 135 and 136:
HORIZONTAL CIRCULATIONVERTICAL CIRC
- Page 137 and 138:
Fig 94STRUCTURAL GRID137
- Page 139 and 140:
SPACES FUNCTIONS AREA(m2)ADMINISTRA
- Page 141 and 142:
5.4NAMEISLAMIC RELIGIOUS AND CULTUR
- Page 143 and 144:
It is a centre in motion, with peop
- Page 145:
MATERIALS USEDBevk Perović Archite
- Page 148 and 149:
NAME BAMIYAN CULTURAL CENTERARCHITE
- Page 150 and 151:
5.5
- Page 152 and 153:
SITE SURROUNDING ANALYSISARCHITECT
- Page 154 and 155:
CONCEPTThe Bamiyan Cultural Centre
- Page 156 and 157:
156KEY ELEMENT OF THE PROJECTThe ke
- Page 158 and 159:
158Fig 107
- Page 160 and 161:
PROGRAMFig 109MASTER PLAN160
- Page 162 and 163:
PERFORMANCE AND EXHIBITION BUILDING
- Page 164 and 165:
SLOPE CIRCULATIONCIRCULATION BETWEE
- Page 166 and 167:
Fig 117CIRCULATION
- Page 168 and 169:
SPACES FUNCTIONS AREA(m2)ADMINISTRA
- Page 170 and 171:
Fig 120
- Page 172 and 173:
Fig 122‘ABSENT PRECENCE’ ‘PRO
- Page 174 and 175:
PROGRAMThe façade acts as a reflec
- Page 177 and 178:
PROGRAM DEVELOPMENT6.0
- Page 179 and 180:
6.1PROPOSEDPROGRAMSPACESFINAL PROJE
- Page 181:
6.3RELATIONSHIPMATRIXENTRANCELOBBYR
- Page 184 and 185:
1847.1Choice OF LOCATIONWHY UAE ?Th
- Page 186 and 187:
As for my project goal, I wouldlike
- Page 188 and 189:
criteriaABU DHABI188
- Page 190 and 191:
AAL ZAHIYAHBMUNICIPALITYMASS PLAN O
- Page 192 and 193:
HeritageParkAL ZAHIYAH OVERVIEWRela
- Page 194 and 195:
Al MarkaziyahEastAl ZahiyahZayed Ci
- Page 196 and 197:
cultural district OVERVIEWRelations
- Page 198 and 199:
AL Safarratal rehhan OVERVIEWRelati
- Page 200 and 201:
Al RehhanDiverse Spatial Layout wit
- Page 202 and 203:
ZONE SELECTION score202CRITERIA A B
- Page 204 and 205:
204LANDMARKS AROUNDTHE SITE
- Page 206 and 207:
206ROAD ACCESS
- Page 208 and 209:
208VEGETATION
- Page 210 and 211:
210BUILDING TYPE
- Page 212 and 213:
SPACESFINAL PROJECT PROGRAM7.6SPATI
- Page 214 and 215:
GRID LAYOUTSURROUNDING HEIGHTContin
- Page 217 and 218:
8.0SECTION IIICONCEPT PROPOSAL
- Page 219 and 220:
8.2INTRODUCING CONCEPT SYSTEMSIMMER
- Page 221 and 222:
STATEGY:MERGINGLOOPAIMS:UNITINGACCE
- Page 223 and 224:
STATEGY:DIVISIONSCATTERAIMS:ORGANIZ
- Page 225 and 226:
STATEGY:MERGINGAIMS:CONNECTIVITYINT
- Page 227 and 228:
BIBLIOGRAPHYESMAILI, YASAMAN, and S
- Page 229 and 230:
BIBLIOGRAPHYFigure 8Kipling, Kalin.