- Page 1: SEEDS OF HOPENARGES ABDUL AZIZ
- Page 5: Approval of the Thesis Book for Fin
- Page 8 and 9: PROJECT NAME SEEDS OF HOPELOCATION
- Page 10 and 11: 20103section 1Introduction PAGE 15
- Page 13: 1.0SECTION 1INTRODUCTION
- Page 17 and 18: 1.2 History that Led to the Loss of
- Page 19 and 20: ‘EVEN ON A MOUNTAIN, THERE IS STI
- Page 21 and 22: LOSS OF AFGHAN CULTURE2.0
- Page 23 and 24: KABUL, AFGHANISTANFig 523
- Page 25 and 26: 25
- Page 27 and 28: Fig 8STREET ART MOVEMENT IN KABUL I
- Page 29 and 30: 29
- Page 31 and 32: One of the main attributes Afghanis
- Page 33 and 34: Fig 13Shrine of hazrat ali ,Mazar-e
- Page 35 and 36: Fig 15BLUE MOSQUEHERAT, AFGHANISTAN
- Page 37 and 38: The carpet crafting is not only use
- Page 39 and 40: Fig 1839
- Page 41 and 42: KABUL, AFGHANISTAN 41
- Page 43 and 44: The Afghan culture has been signifi
- Page 45 and 46: The cultural heritage of the countr
- Page 47 and 48: Fig 2247
- Page 49 and 50: Artists, such as Shamsia Hassani, r
- Page 51 and 52: 2.5 Present Issue Endangers Culture
- Page 53: 53
- Page 56 and 57: 56
- Page 58 and 59: 58Fig 25
- Page 60 and 61: 3.4 Present Issue Challenges Women
- Page 62 and 63: Fig 273.3 Development of Women’s
- Page 65 and 66:
4.0Rise of Afghan Community Outside
- Page 67 and 68:
67
- Page 69 and 70:
4.3 Home far From Home: Afghan Comm
- Page 71:
4.4 UAE: ASmall WorldThe largest ex
- Page 74 and 75:
NAME WULIEPOCH CULTURAL CENTERARCHI
- Page 76 and 77:
5.1
- Page 78 and 79:
ARCHITECT ATELIER ALTER ARCHITECTSL
- Page 80 and 81:
80Fig 35
- Page 82 and 83:
82Fig 37
- Page 84 and 85:
APPROACHThe project interprets natu
- Page 86 and 87:
PROGRAM1. Main Entrance2. Courtyard
- Page 88 and 89:
PROGRAM INVESTIGATIONFig 4188
- Page 90 and 91:
ADMINISTRATION PROGRAMLEISURE PROGR
- Page 92 and 93:
92
- Page 94 and 95:
FIRST FLOOR PLANFig 48SECOND FLOOR
- Page 96 and 97:
ROOF PLAN CICULATIONFig 52Sloping D
- Page 98 and 99:
STRUCTURE AND GRIDFig 54FIRST FLOOR
- Page 100 and 101:
100Fig 57
- Page 102 and 103:
SITEA huge “urban living room”f
- Page 104 and 105:
The building is conceived as a loop
- Page 106 and 107:
106Fig 63
- Page 108 and 109:
CONTINUITY OF THE LINEAR PROMENADEP
- Page 110 and 111:
110Fig 69
- Page 113 and 114:
5.3CASE STUDIESCASE STUDIES OF CULT
- Page 115 and 116:
PROJECT DESCRIPTIONThe new location
- Page 117 and 118:
Fig 74PORTLAND JAPANESE CULTURAL VI
- Page 119 and 120:
SITE OF THE PROJECTThe project rein
- Page 121 and 122:
Fig 78121
- Page 123 and 124:
Fig 80VISIONA trio of buildings clu
- Page 125 and 126:
MAIN GATEFig 82125
- Page 127 and 128:
MASTER PLANFig 84127
- Page 129 and 130:
materials usedWhile natural wood fo
- Page 131 and 132:
SUSTAINABILITYThe custom metal roof
- Page 133 and 134:
ADMINISTRATION PROGRAMLEISURE PROGR
- Page 135 and 136:
HORIZONTAL CIRCULATIONVERTICAL CIRC
- Page 137 and 138:
Fig 94STRUCTURAL GRID137
- Page 139 and 140:
SPACES FUNCTIONS AREA(m2)ADMINISTRA
- Page 141 and 142:
5.4NAMEISLAMIC RELIGIOUS AND CULTUR
- Page 143 and 144:
It is a centre in motion, with peop
- Page 145:
MATERIALS USEDBevk Perović Archite
- Page 148 and 149:
NAME BAMIYAN CULTURAL CENTERARCHITE
- Page 150 and 151:
5.5
- Page 152 and 153:
SITE SURROUNDING ANALYSISARCHITECT
- Page 154 and 155:
CONCEPTThe Bamiyan Cultural Centre
- Page 156 and 157:
156KEY ELEMENT OF THE PROJECTThe ke
- Page 158 and 159:
158Fig 107
- Page 160 and 161:
PROGRAMFig 109MASTER PLAN160
- Page 162 and 163:
PERFORMANCE AND EXHIBITION BUILDING
- Page 164 and 165:
SLOPE CIRCULATIONCIRCULATION BETWEE
- Page 166 and 167:
Fig 117CIRCULATION
- Page 168 and 169:
SPACES FUNCTIONS AREA(m2)ADMINISTRA
- Page 170 and 171:
Fig 120
- Page 172 and 173:
Fig 122‘ABSENT PRECENCE’ ‘PRO
- Page 174 and 175:
PROGRAMThe façade acts as a reflec
- Page 177 and 178:
PROGRAM DEVELOPMENT6.0
- Page 179 and 180:
6.1PROPOSEDPROGRAMSPACESFINAL PROJE
- Page 181:
6.3RELATIONSHIPMATRIXENTRANCELOBBYR
- Page 184 and 185:
1847.1Choice OF LOCATIONWHY UAE ?Th
- Page 186 and 187:
As for my project goal, I wouldlike
- Page 188 and 189:
criteriaABU DHABI188
- Page 190 and 191:
AAL ZAHIYAHBMUNICIPALITYMASS PLAN O
- Page 192 and 193:
HeritageParkAL ZAHIYAH OVERVIEWRela
- Page 194 and 195:
Al MarkaziyahEastAl ZahiyahZayed Ci
- Page 196 and 197:
cultural district OVERVIEWRelations
- Page 198 and 199:
AL Safarratal rehhan OVERVIEWRelati
- Page 200 and 201:
Al RehhanDiverse Spatial Layout wit
- Page 202 and 203:
ZONE SELECTION score202CRITERIA A B
- Page 204 and 205:
204LANDMARKS AROUNDTHE SITE
- Page 206 and 207:
206ROAD ACCESS
- Page 208 and 209:
208VEGETATION
- Page 210 and 211:
210BUILDING TYPE
- Page 212 and 213:
SPACESFINAL PROJECT PROGRAM7.6SPATI
- Page 214 and 215:
GRID LAYOUTSURROUNDING HEIGHTContin
- Page 217 and 218:
8.0SECTION IIICONCEPT PROPOSAL
- Page 219 and 220:
8.2INTRODUCING CONCEPT SYSTEMSIMMER
- Page 221 and 222:
STATEGY:MERGINGLOOPAIMS:UNITINGACCE
- Page 223 and 224:
STATEGY:DIVISIONSCATTERAIMS:ORGANIZ
- Page 225 and 226:
STATEGY:MERGINGAIMS:CONNECTIVITYINT
- Page 227 and 228:
BIBLIOGRAPHYESMAILI, YASAMAN, and S
- Page 229 and 230:
BIBLIOGRAPHYFigure 8Kipling, Kalin.