28 Step 15 N28hw (40) (16) 1 Install the first ridge cap on the completed roof section using bolts and nuts. Fasten roof panel overlaps not used for ridge cap. Cover the head of bolt with the 2" (5,1 cm) piece of weather stripping tape. Do not fasten the ends of the ridge cap at this time. 2 Install the second ridge cap overlapping the first ridge cap while installing the remaining narrow roof panels. Continue weather stripping the ridge. 3 Fasten the lower end of the panels to the side wall angles using screws and washers. Use bolts and nuts through wall angle overlaps at the bottom of the panel. ● Parts Needed For ● Ridge Caps & Panels Cut Weather Stripping and Fold Under 7571 8486 ● 8840 Ridge Cap (1) ● 7571 Roof Panel (2) ● 8486 Ridge Cap (1) 8840 Strips STEP 2 STEP 3 STEP 1 7571
Step 16 A29hw (4) (8) (4) 1 Attach the right and left side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap. 2 Using your thumb and index finger, overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners. 3 Fasten the roof trim caps to the side trim using a screw. 4 Fasten the roof panel ribs, peak caps and ridge caps together using bolts and nuts. Peak Cap ● Parts Needed For ● Roof Trim STEP 1 Roof Trim 8836 8485 STEP 4 STEP 2 ● 8485 Left Side Roof Trim (2) ● 8836 Right Side Roof Trim (2) Roof Trim Cap STEP 3 8485 8836 Tuck Flange Inward to Fit Inside of Roof Trim Cap 29
- Page 1 and 2: Owner's Manual & Assembly Instructi
- Page 3 and 4: A3 Watch the Weather: Be sure the d
- Page 5 and 6: A5 Web Finish: For long lasting fin
- Page 7 and 8: THIS PAGE WAS LEFT BLANK INTENTIONA
- Page 9 and 10: A09hw The Base For Your Building Ba
- Page 11 and 12: N11hw 65103 #8-32 Hex Nut (169) 660
- Page 13 and 14: 13 Assembly by Key No. N13et 20 20
- Page 15 and 16: Step 2 D15hw (6) The main frame pie
- Page 17 and 18: Step 4 A17hw END VIEW (4) The door
- Page 19 and 20: Step 6 L19hw (26) (4) NOTE The rema
- Page 21 and 22: Step 8 D21hw (112) (17) The wall pa
- Page 23 and 24: Step 10 N23et (8) The gables go on
- Page 25 and 26: Step 12 N25hw 1 Wrap the weather st
- Page 27: Step 14 N27hw (38) (22) 1 Install a
- Page 31 and 32: Step 18 A31hw (8) 1 From inside the
- Page 33 and 34: 711680705 * Nombre de la pieza *Dé
- Page 35 and 36: • 1,6 cm Mindestdicke. Qualitäts
- Page 37: XC33hw SOME FACTS ABOUT RUST SOME F
28<br />
Step 15<br />
N28hw<br />
(40) (16)<br />
1 Install the first ridge cap on the<br />
completed roof section using bolts<br />
and nuts. Fasten roof panel overlaps<br />
not used for ridge cap. Cover the<br />
head of bolt with the 2" (5,1 cm) piece<br />
of weather stripping tape. Do not<br />
fasten the ends of the ridge cap at this<br />
time.<br />
2 Install the second ridge cap overlapping<br />
the first ridge cap while installing<br />
the remaining narrow roof<br />
panels. Continue weather stripping<br />
the ridge.<br />
3 Fasten the lower end of the panels<br />
to the side wall angles using screws<br />
and washers. Use bolts and nuts<br />
through wall angle overlaps at the<br />
bottom of the panel.<br />
● Parts Needed For ●<br />
Ridge Caps & Panels<br />
Cut Weather<br />
Stripping and<br />
Fold Under<br />
7571<br />
8486<br />
● 8840 Ridge Cap (1)<br />
● 7571 Roof Panel (2)<br />
● 8486 Ridge Cap (1)<br />
8840<br />
Strips<br />
STEP<br />
2<br />
STEP<br />
3<br />
STEP<br />
1<br />
7571