D0208_STIB_M24.doc<br />

TIP5-CT-2006-031312 Page 9 of 44<br />

URBAN TRACK Issued: August 13, 2008<br />

Quality checked and approved by project co-ordinator André Van Leuven<br />

2.1.3. Ancillary conditions for build-up welding<br />

Rail with a tensile strength of up to 700 N/mm²<br />

no problems, material safe to work with.<br />

Rail with a tensile strength of up to 900 N/mm² (and above)<br />

Pre-heating is necessary for the first ignition of the arc (to 400°C), this temperature needs to be<br />

maintained throughout; this poses a difficulty due to the conditions prevailing on the construction<br />

site (weather, tram/car traffic, measuring equipment measuring surface only etc.) .<br />

Rail from special material (manganese steel):<br />

only to be welded with matched filler metals; the parts worked with have to be cooled (e.g. dry ice).<br />

Remark: Rail of lower quality is easier to « re-vamp » !