27.12.2012 Views

DELIVERABLE 2.8 - urban track

DELIVERABLE 2.8 - urban track

DELIVERABLE 2.8 - urban track

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.1.2. Maintenance measures<br />

Figure 2.2<br />

D0208_STIB_M24.doc<br />

TIP5-CT-2006-031312 Page 8 of 44<br />

URBAN TRACK Issued: August 13, 2008<br />

Quality checked and approved by project co-ordinator André Van Leuven<br />

Widening of the rail geometry in narrow curves.<br />

Use of rail with larger groove width (Ph 37a) where possible in the <strong>track</strong>’s environment (e.g. turn<br />

backs).<br />

Lubrication (lubricant or water) in narrow curves (figure 2.2).<br />

Use of rail with hardened head.<br />

Build-up welding (rail head).<br />

Grinding.<br />

Exchange of rail.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!