DELIVERABLE 2.8 - urban track
DELIVERABLE 2.8 - urban track
DELIVERABLE 2.8 - urban track
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 3.20<br />
Figure 3.21<br />
D0208_STIB_M24.doc<br />
TIP5-CT-2006-031312 Page 42 of 44<br />
URBAN TRACK Issued: August 13, 2008<br />
Quality checked and approved by project co-ordinator André Van Leuven<br />
Payback period for the ATM-curve. Comparison of design expenses and maintenance savings<br />
Cost saving by means of the ATM – curve