Figure 3.17 shows a typical time plot along the clothoid with constant cant gradients before the<br />

reconstruction and afterwards the Viennese transition curves with Viennese cant gradients, the switch<br />

connection is in the middle of picture. The investigated transition curves are outmost left and right in the<br />

picture.<br />

Comparison old and new alignment design <strong>track</strong> 1 sections A and B travelling direction