13.03.2023 Views

SRIJAN 2002-2003(1st Edition)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

while the remaining space has been leased ou t

to Multinationals.

WEBB TEAM'S EFFORTS FOR A

SUCCESSFUL PETRONAS TOWER

When it came to the mammoth task of

installing all the security and data wiring for

the project Webb Electronics was selected to

supply and install all the security and data

cabling for an intelligent building

environment.

The sheer size of the project was daunting to

begin with, necessitating the supply,

installation and testing of almost 700km of

cable, including fibre, co-ax, Cat 5 and

telephone cabling. This infrastructure was

designed to serve such things as security

cameras, smart card readers, door entry

controls, and almost 6000 voice and data

communications points. All horizontal data

cabling on each of the 88 floors of both towers

was Belden, Cat 5 copper is connected to a

'vertical fibre' backbone running up each of the towers.

"The unique construction

challenges presented by the

Towers also impacted on the

design of the structured cabling

system. In effect, we had to

design the system as we went

along As these required us to

make a number of on the spot

decisions as to how we could

accommodate those changes

within our design " says Webb.

The shape of the Towers also

meant that every single floor

was slightly different than the

one below it, meaning that Webb

could not simply produce a 'standard'

design template for each floor.

In the spirit of Lao Tse, the Chinese

philosopher, "Architecture's power

lies not in its physical powers but

instead in the space created by those

walls."

Compiled by:

Swati Mahajart,

First Year,

Architecture.

There can neve- be a complete confidence in a power which is excessive.