The entire project area is fully developed with no vegetation on both sides of the road. Important<br />

features along the corridor of the road are petrol lling stations, schools, BCOS, shopping complexes,<br />

residential, buildings, Mosques, Churches, event centres, eateries, police station etc. The trafc volume<br />

on the road before its dualization was huge and always led to trafc log jams at the junctions on the<br />

road way.<br />

The road commences at Idi Ape, passes through Basorun, Akobo Ojurin and terminates at Odogbo<br />

Barrack Junction. The length of the road is 7.252km.<br />

There is a 1.2m wide median. Thus, the total width of the road way from drain to drain is 23.7m.<br />

The general scope of the works are:<br />

i. Clearing of site on either side of the carriageway of the carriageway of all shrubs, trees, wall,<br />

fences e.t.c,<br />

ii. Scarication of existing asphaltic concrete surfacing<br />

iii. Relocation of existing services including NITEL, PHCN and Water Corporation of Oyo State.<br />

iv. Making up of the design formation level using approved lateritic materials.<br />

v. Construction of pavement structure with the following<br />

FEATURES:<br />

a) 200mm thick lateritic sub base,<br />

b) 200mm thick crushed stone base,<br />

c) 50mm thick binder course of asphaltic concrete,<br />

d) 40mm thick wearing course of asphaltic concrete,<br />

e) Placing of 100mm thick concrete on medians and walkways,<br />

f) Construction of Trapezoidal Reinforced concrete lined drain,<br />

g) Construction of reinforced concrete retaining wall,<br />

h) Construction of box culverts or various sizes,<br />

i) Laying of kerbs to walkways and medians,<br />

j) Pavement markings and provision of road signs,<br />

k) Removal and carting away of suitable materials from roadway,<br />

l) Provision of 4 no-250mm diameter service ducts at junctions<br />

and designated points.