Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
Residents in the area described their experiences on the road as terrible and lamented the damage caused by the road on their vehicles. Some commercial drivers decried that the situation had seriously affected their income, and noted that daily trips along the route had drastically reduced. The contract for the rehabilitation of the road which was awarded in May 2017 and was supposed to be completed within 18months. However, the rehabilitation of the road was taking longer than necessary, which resulted in the termination of the contract by Governor Seyi Makinde. Residents called on Governor Seyi Makinde to prevail in the situation and re-award on the road contract to ease the hardships being experienced on the road. Between the city nad ‘less’ city. The road was re-awarded by Governor Seyi Makinde through the Alternative Project Funding Approach (APFA), which allows the State to pay over time after the contractor must have nanced the project. This again is one, among many others of the GSM infrastructure revolution in Ibadan and Oyo State at large.
BRIEF TECHNICAL DETAILS OF THE DUALIZATION OF (7.25km) IDI-APE - BASORUN - AKOBO - ODOGBO BARRACKS JUNCTION PROJECT IDI APE – BASORUN – AKOBO – ODOGBO BARRACK JUNCTION ROAD is a 7.25 km comprising of a yover over-pass across Lagos - Ibadan – Oyo Expressway linking the city with less city. It was originally awarded to ENL on 19th May 2017 but stalled at 35.76% progress till it was terminated for non performance by May 2020. For expediency, the project was split into 2 work-scopes, and re-awarded separately. THE ROAD The contract for the dualization of Basorun –Akobo – Odogbo Barracks Junction was awarded on 12 November, 2020. The road is within Ibadan metropolis, precisely within Lagelu Local Government Area. It serves as a link to many major roads such as Ibadan – Lagos Expressway, Agodi/Bus top – Idi Ape – Iwo Road Interchange, Iwo Road, Olorunda Community and 2nd mechanized division of Nigerian Army, Odogbo barrack, Ibadan.
- Page 1 and 2: COMPENDIUM OF PROJECTS ROADMAP FOR
- Page 3: His Excellency Engr. OluSeyi Abiodu
- Page 6 and 7: OYO STATE GOVERNMENT Legislative, E
- Page 8 and 9: Government of Oyo State Presented t
- Page 10 and 11: TTE EETE EEET
- Page 12 and 13: Preamble ne of my proudest moments
- Page 14 and 15: FIGURE 1: PROJECT DELIVERY COST PER
- Page 16 and 17: All this put together and happening
- Page 18: To deliver on His Excellency's prom
- Page 22 and 23: In sar, the state is gradually expe
- Page 24: By “Doing What We Say”, “Doin
- Page 28 and 29: TE EEET TTE
- Page 32 and 33: HH H
- Page 34 and 35: ACHIEVEMENTS OF GOVERNOR MAKINDE'S
- Page 36 and 37: Rehabilitation of Saki - Igboho Roa
- Page 38 and 39: Reconstruction of Isaba Ogundoyin r
- Page 41 and 42: THE DUALIZATION OF IDI-APE - BASORU
- Page 43: Lit UP IDI-APE - BASORUN - AKOBO -
- Page 46 and 47: His Excellency Engr. OluSeyi Abiodu
- Page 48 and 49: So, I can say with all condence: An
- Page 52 and 53: The entire project area is fully de
- Page 54 and 55: FLY-OVER BRIDGE AT GENERAL GAS
- Page 59 and 60: FLYOVER AT GENERAL GAS Flag Off, Sp
- Page 61 and 62: 6
- Page 63 and 64: E E
- Page 72 and 73: EASE OF DOING BUSINESS 2019-2023
- Page 74: CHALLENGE ROUNDABOUT: BEFORE
- Page 79 and 80: CHALLENGE JUNCTION IMPROVEMENT OYO
- Page 81 and 82: When we say time is money, we can t
- Page 83 and 84: BEERE - DUGBE ROAD
- Page 85: STADIUM-UNDER G-LAUTECH GATE ROAD O
- Page 94 and 95: MONIYA-ISEYIN ROAD OYO STATE THE PA
- Page 96 and 97: His Excellency Engr. OluSeyi Abiodu
- Page 98 and 99: Looking at the initial design, we a
Residents in the area described their<br />
experiences on the road as terrible and<br />
lamented the damage caused by the road on<br />
their vehicles.<br />
Some commercial drivers decried that the<br />
situation had seriously affected their income,<br />
and noted that daily trips along the route had<br />
drastically reduced.<br />
The contract for the rehabilitation of the road<br />
which was awarded in May 2017 and was<br />
supposed to be completed within 18months.<br />
However, the rehabilitation of the road was<br />
taking longer than necessary, which resulted in<br />
the termination of the contract by Governor<br />
Seyi Makinde.<br />
Residents called on Governor Seyi Makinde to<br />
prevail in the situation and re-award on the<br />
road contract to ease the hardships being<br />
experienced on the road. Between the city<br />
nad ‘less’ city.<br />
The road was re-awarded by Governor Seyi<br />
Makinde through the Alternative Project<br />
Funding Approach (APFA), which allows the<br />
State to pay over time after the contractor<br />
must have nanced the project.<br />
This again is one, among many others of the<br />
GSM infrastructure revolution in Ibadan and<br />
Oyo State at large.