v29
Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
Governor Seyi Makinde’s Remarks at the Commissioning of the Construction of the 65m General Gas Flyover and the Dualisation of the 7.2 Km Idi Ape-Basorun-Akobo-Odogbo Barracks Road, Ibadan
- Page 1 and 2: COMPENDIUM OF PROJECTS ROADMAP FOR
- Page 3: His Excellency Engr. OluSeyi Abiodu
- Page 6 and 7: OYO STATE GOVERNMENT Legislative, E
- Page 8 and 9: Government of Oyo State Presented t
- Page 10 and 11: TTE EETE EEET
- Page 12 and 13: Preamble ne of my proudest moments
- Page 14 and 15: FIGURE 1: PROJECT DELIVERY COST PER
- Page 16 and 17: All this put together and happening
- Page 18: To deliver on His Excellency's prom
- Page 22 and 23: In sar, the state is gradually expe
- Page 24: By “Doing What We Say”, “Doin
- Page 28 and 29: TE EEET TTE
- Page 32 and 33: HH H
- Page 34 and 35: ACHIEVEMENTS OF GOVERNOR MAKINDE'S
- Page 36 and 37: Rehabilitation of Saki - Igboho Roa
- Page 38 and 39: Reconstruction of Isaba Ogundoyin r
- Page 41 and 42: THE DUALIZATION OF IDI-APE - BASORU
- Page 43: Lit UP IDI-APE - BASORUN - AKOBO -
- Page 47 and 48: The construction of the 65m General
- Page 49 and 50: IDIAPE - BASORUN - AKOBO ROAD OF OL
- Page 51 and 52: BRIEF TECHNICAL DETAILS OF THE DUAL
- Page 53 and 54: AKOBO OJU IRIN
- Page 55: TO IWO RD IDI -APE TO BASHORUN - AK
- Page 60 and 61: contractor before we stopped the wo
- Page 62 and 63: 62
- Page 64: Expansion of Oke Adu Junction - Ago
- Page 73 and 74: CHALLENGE JUNCTION IMPROVEMENT
- Page 76: NOW
- Page 80 and 81: His Excellecy, OluSeyi Makinde at t
- Page 82 and 83: So, while some people get angry whe
- Page 84 and 85: EDUCATION OYO STATE THE PACESETTER
- Page 87: Remarks at the Flag-Off of the ‘L
Governor Seyi Makinde’s Remarks at<br />
the Commissioning of the Construction<br />
of the 65m General Gas Flyover and<br />
the Dualisation of the 7.2 Km<br />
Idi Ape-Basorun-Akobo-Odogbo<br />
Barracks Road, Ibadan