Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023 Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc Vol 1 Compiled by Engr Seyi Adeleye, MNSE

Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THE ENGR. LERE ADIGUN G.R.A<br />

INFRASTRUCTURE DELIVERY PROJECT CONT.<br />

<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

3.5km Road Network (2 x Major Roads & 11<br />

Minor Roads)<br />

7.0km Of reinforced concrete drainages<br />

Stream channel designed for complete<br />

evacuation at maximum Rainfall<br />

Perimeter fencing & Coordinated security<br />

network<br />

Electrical substations & 100% reticu-lation to<br />

all housing units<br />

Water plant & 100% reticulation to all housing<br />

units<br />

Estate management services for long term<br />

preservation<br />

ROAD NETWORK<br />

High strength 80mm Pavers<br />

were used for the road<br />

network for longevity and<br />

ease of maintenance. Thirteen<br />

interconnecting roads were created to service<br />

the GRA. The road network is serviced by open<br />

reinforced drainage systems that can be repeatedly<br />

cleaned to ensure the best HSE standards are<br />

maintained in a topographically unique city like<br />

Ibadan. Also effective drainage for greater than 100%><br />

of maximum rainfall has been incorporated into the<br />

design and tested during the last 12 months of the<br />

project. The roads are designed for both the<br />

construction phase when heavy duty traffic is at<br />

maximum and post-construction phases .<br />

Adequate walkways are provided to ensure highstanda<br />

rd communal living and safe humanautomobile<br />

interaction. A 1-meter walkway is<br />

mandatory for all homeowners to ensure uniformity<br />

and high aesthetic value of the GRA.<br />

ELECTRIFICATION<br />

A 2MVA 33kv Injection<br />

Substation that ensures<br />

maximum availability from<br />

the power distribution comp<br />

any (IBEDC) and is<br />

designed for 100% GRA Residential Occupation,<br />

from inception, is installed and operational in the<br />

GRA. Three (3) 500kva and One (1) 350kva 11kv