v29
Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
OYOSTATE 1 EXPANSIONOFIWORD–ADEGBAYIJUNCTION (5.5km) KOPEKCONSTRUCTIONLTD 2 DUALISATIONOFAGODIGATE‐OLDIFERD‐ AIRPORTADEGBAYIIBADAN(8.2km) KOPEKCONSTRUCTIONLTD 3 DUALIZATIONOFAIRPORTRD/ADJOININGRDSAND REHABILITATIONOFSPURIWORDINTERCHANGE (5.19km) KOPEKCONSTRUCTIONLTD 4 BEERE‐ORITAAPERIN–AKANRANRD(37.41km) CHARVETCONSTRUCTIONLTD 5 AIRPEACEINAUGURALFLIGHTE195‐E2TOIBADAN AIRPORT. 22 COMMISIONINGOF AIRPORTROADDUALIZATION& AVIATIONTANKFARM 27
OYOSTATE 6 IBADANCIRCULARRD CRANEBURGECONSTRUCTIONCOMPANY 7 AIRPORT–AJIA–NEWIFEEXPRESSWITHSPURTO AMULOKO(21km) PECULIARULTIMATECONCERNSLTD 8 9 11 671AIRFORCEBASE,IBADAN IBADAN–IWORD‐OSHOGBO(35.6km) PECULIARULTIMATECONCERNSLTD IBADANCIRCULARRDXNEWIFEEXPRESSWAY INTERCHANGE COMMISIONINGOF AIRPORTROADDUALIZATION& AVIATIONTANKFARM 28 2
- Page 221: 22
- Page 225 and 226: OYO STATIE PACES TER 5Y MINISTRY OF
- Page 227: Oya State Government 22
- Page 230 and 231: CHALLENGE 20 BUS TERMINAL
- Page 232 and 233: GOVERNOR SEYI MAKINDE’S SPEECH AT
- Page 234 and 235: 4
- Page 237: Challenge Bus Terminal: The Infrast
- Page 243: BUS MASS TRANSIT
- Page 246 and 247: OYOSTATE E PACl:S TTE ST T TRANSPOR
- Page 250 and 251: Omi Titun Bus Service: Phase 1 Omi
- Page 252 and 253: Omi Titun Bus Service: Phase 1 Chal
- Page 254 and 255: Train station obafemi Awolowo stond
- Page 256 and 257: OJOO BUS TERMINAL NEW IFE ROAD BUS
- Page 258 and 259: 2
- Page 260 and 261: 20 OYOSTAT 1 E . P CES£ TER 5T
- Page 262 and 263: 22
- Page 264 and 265: 2
- Page 266 and 267: 2
- Page 268 and 269: 2
- Page 270 and 271: TRANSPORTATIONAGENDA OYOSTATE Airpo
- Page 274 and 275: REMARKS AT THE FLAG-OFF OF THE TWEN
- Page 276 and 277: and able to deliver on these projec
- Page 278 and 279: 2
- Page 280 and 281: 20
- Page 282 and 283: 22
- Page 284 and 285: DUALIZATION OF AGODI GATE - OLD IFE
- Page 286 and 287: 2
- Page 288 and 289: 2
- Page 290 and 291: 20
- Page 292 and 293: 22
- Page 294 and 295: 2
- Page 296 and 297: 2
- Page 298 and 299: OYOSTATE 2 COMMISIONINGOF AVIATIONF
- Page 300 and 301: OYOSTATE AERIALPHOTOGRAPHOF IBADAN
- Page 302 and 303: SNAPSHOTOFTHEIBADANAIRPORTUPGRADE A
- Page 304 and 305: OYOSTATE 0 COMMISIONINGOF AVIATIONF
- Page 306 and 307: OYOSTATE 0 COMMISIONINGOF AVIATIONF
- Page 308 and 309: AVIATION TANK FARM COMMISSIONING OF
- Page 310 and 311: REMARKSBYGOVERNORSEYIMAKINDEATTHEWE
- Page 312 and 313: 3 GOVERNORSEYIMAKINDE'SREMARKSATTHE
- Page 314 and 315: 3 SPEECHOFTHEAIRPORTMANAGERFORCOMME
- Page 316 and 317: DR.VICTOROMOLOLUOLUNLOYOAIRPORTROAD
- Page 318 and 319: AIRPORTROAD WORKINPROGRESS OYOSTATE
- Page 320 and 321: SPEECH OF THE AIRPORT MANAGER FOR C
OYOSTATE<br />
1<br />
EXPANSIONOFIWORD–ADEGBAYIJUNCTION<br />
(5.5km)<br />
KOPEKCONSTRUCTIONLTD<br />
2<br />
DUALISATIONOFAGODIGATE‐OLDIFERD‐<br />
AIRPORTADEGBAYIIBADAN(8.2km)<br />
KOPEKCONSTRUCTIONLTD<br />
3<br />
DUALIZATIONOFAIRPORTRD/ADJOININGRDSAND<br />
REHABILITATIONOFSPURIWORDINTERCHANGE<br />
(5.19km)<br />
KOPEKCONSTRUCTIONLTD<br />
4<br />
BEERE‐ORITAAPERIN–AKANRANRD(37.41km)<br />
CHARVETCONSTRUCTIONLTD<br />
5<br />
AIRPEACEINAUGURALFLIGHTE195‐E2TOIBADAN<br />
AIRPORT.<br />
<br />
22<br />
COMMISIONINGOF<br />
AIRPORTROADDUALIZATION&<br />
AVIATIONTANKFARM<br />
27