Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
Oyo State Compendium of Infrastructure Delivery Projects 2019 - 2023
Accomplished by the executive Governor Engr, Seyi Makinde, FNSE, D.Sc
Vol 1 Compiled by Engr Seyi Adeleye, MNSE
OYOSTATE E PACl:S TTE ST T TRANSPORTATION IS KEY TO PROSPERITY BETWEEN OJOO & CHALLENGE DEDICATED DIRECT (NON-STOP} SERVICE SERVICE BETWEEN OJOO & CHALLENGE VIA 3 DIFFERENT ROUTES STOPING AT INTERMEDIATE BUS SHELTERS ( 4
CHALLENGE BUS TERMINAL Proposed Omititun Bus Mass Transit (OBMT) - Pilot Scheme The proposed OmiTitun Bus Mass Transit (OBMT) debuts from 2 ultra-modern Mega bus terminals out of the 4 planned in Ibadan are located at the "cardinal entry/ loading points" into the city's metropolitan areas; Ojoo in the North Flank, Challenge in the South, New lfe Road in the Eastern flank and lwo Rd in the North East flank. The Mass Transit service will run regular, scheduled airconditioned, mass transit bus service between 6:00pm and 8:00 pm with a pilot that will introduce 29 Nos x 56 seater mass transit buses every 30 minutes between the terminals at Challenge and Ojoo and intermediate bus stops /shelters along 3 major arterial routes with a dedicated non-stop service between the terminals and additional services to meet the Morning and Evening trains service at the Obafemi Awolowo (Standard Gauge) Train Station at Moniya.
- Page 195 and 196: THE UNRAVELING
- Page 197: THE UNRAVELING
- Page 201 and 202: 2
- Page 203 and 204: 20
- Page 205 and 206: Apete - Awotan - Akufo Junction roa
- Page 207 and 208: New Garage - Odo Ona Elewe - Apata
- Page 209 and 210: 20
- Page 211 and 212: 2
- Page 213 and 214: ASPHALTIC PATCHING OF POTHOLES 2
- Page 215 and 216: Public Transportation in Ibadan is
- Page 217 and 218: 2
- Page 219 and 220: Sagamu Bus Park Toll Gate Bus Park
- Page 221: 22
- Page 225 and 226: OYO STATIE PACES TER 5Y MINISTRY OF
- Page 227: Oya State Government 22
- Page 230 and 231: CHALLENGE 20 BUS TERMINAL
- Page 232 and 233: GOVERNOR SEYI MAKINDE’S SPEECH AT
- Page 234 and 235: 4
- Page 237: Challenge Bus Terminal: The Infrast
- Page 243: BUS MASS TRANSIT
- Page 250 and 251: Omi Titun Bus Service: Phase 1 Omi
- Page 252 and 253: Omi Titun Bus Service: Phase 1 Chal
- Page 254 and 255: Train station obafemi Awolowo stond
- Page 256 and 257: OJOO BUS TERMINAL NEW IFE ROAD BUS
- Page 258 and 259: 2
- Page 260 and 261: 20 OYOSTAT 1 E . P CES£ TER 5T
- Page 262 and 263: 22
- Page 264 and 265: 2
- Page 266 and 267: 2
- Page 268 and 269: 2
- Page 270 and 271: TRANSPORTATIONAGENDA OYOSTATE Airpo
- Page 272 and 273: OYOSTATE 1 EXPANSIONOFIWORD-ADEGBAY
- Page 274 and 275: REMARKS AT THE FLAG-OFF OF THE TWEN
- Page 276 and 277: and able to deliver on these projec
- Page 278 and 279: 2
- Page 280 and 281: 20
- Page 282 and 283: 22
- Page 284 and 285: DUALIZATION OF AGODI GATE - OLD IFE
- Page 286 and 287: 2
- Page 288 and 289: 2
- Page 290 and 291: 20
- Page 292 and 293: 22
- Page 294 and 295: 2
OYOSTATE<br />
E PACl:S TTE ST T<br />
TRANSPORTATION IS KEY TO PROSPERITY<br />
BETWEEN OJOO & CHALLENGE<br />
DEDICATED DIRECT (NON-STOP}<br />
SERVICE<br />
SERVICE BETWEEN OJOO &<br />
CHALLENGE VIA 3 DIFFERENT<br />
ROUTES STOPING AT<br />
INTERMEDIATE BUS SHELTERS<br />
(<br />
4