- Page 1 and 2:
COMPENDIUM OF PROJECTS ROADMAP FOR
- Page 3:
His Excellency Engr. OluSeyi Abiodu
- Page 6 and 7:
OYO STATE GOVERNMENT Legislative, E
- Page 8 and 9:
Government of Oyo State Presented t
- Page 10 and 11:
TTE EETE EEET
- Page 12 and 13:
Preamble ne of my proudest moments
- Page 14 and 15:
FIGURE 1: PROJECT DELIVERY COST PER
- Page 16 and 17:
All this put together and happening
- Page 18:
To deliver on His Excellency's prom
- Page 22 and 23:
In sar, the state is gradually expe
- Page 24:
By “Doing What We Say”, “Doin
- Page 28 and 29:
TE EEET TTE
- Page 32 and 33:
HH H
- Page 34 and 35:
ACHIEVEMENTS OF GOVERNOR MAKINDE'S
- Page 36 and 37:
Rehabilitation of Saki - Igboho Roa
- Page 38 and 39:
Reconstruction of Isaba Ogundoyin r
- Page 41 and 42:
THE DUALIZATION OF IDI-APE - BASORU
- Page 43:
Lit UP IDI-APE - BASORUN - AKOBO -
- Page 46 and 47:
His Excellency Engr. OluSeyi Abiodu
- Page 48 and 49:
So, I can say with all condence: An
- Page 50 and 51:
Residents in the area described the
- Page 52 and 53:
The entire project area is fully de
- Page 54 and 55:
FLY-OVER BRIDGE AT GENERAL GAS
- Page 59 and 60:
FLYOVER AT GENERAL GAS Flag Off, Sp
- Page 61 and 62:
6
- Page 63 and 64:
E E
- Page 72 and 73:
EASE OF DOING BUSINESS 2019-2023
- Page 74:
CHALLENGE ROUNDABOUT: BEFORE
- Page 79 and 80: CHALLENGE JUNCTION IMPROVEMENT OYO
- Page 81 and 82: When we say time is money, we can t
- Page 83 and 84: BEERE - DUGBE ROAD
- Page 85: STADIUM-UNDER G-LAUTECH GATE ROAD O
- Page 94 and 95: MONIYA-ISEYIN ROAD OYO STATE THE PA
- Page 96 and 97: His Excellency Engr. OluSeyi Abiodu
- Page 98 and 99: Looking at the initial design, we a
- Page 100 and 101: The Moniya-Ijaiye-Iseyin Road is th
- Page 104 and 105: SAKI TOWNSHIP ROAD OYO STATE THE PA
- Page 106 and 107: T
- Page 110 and 111: His Excellency Engr. OluSeyi Abiodu
- Page 112 and 113: Commissioning proper by His Excelle
- Page 116 and 117: COMMISSIONING OF 5.25KM GEDU - OROK
- Page 118 and 119: His Excellency Engr. OluSeyi Abiodu
- Page 120: This seventy-six point seven-kilome
- Page 124 and 125: His Excellency Engr. OluSeyi Abiodu
- Page 134 and 135: GOVERNOR SEYI MAKINDE'S REMARKS AT
- Page 136 and 137: For example, we had to increase the
- Page 140 and 141: 4
- Page 142 and 143: 4
- Page 144 and 145: 44
- Page 146 and 147: 4 Ogbomoso - Iseyin Road
- Page 148 and 149: 4
- Page 150 and 151: Governor Seyi Makinde’s Remarks a
- Page 152 and 153: It bears repeating that where roads
- Page 154: OMI TITUN TRANSFORMATION STAGE 4
- Page 160 and 161: INFRASTRUCTURE DEVELOPMENT SUPPORTI
- Page 164: 14
- Page 173 and 174: ..,_
- Page 175: The Senator Rashidi Adewolu Ladoja
- Page 178 and 179:
SENATOR RASHIDI ADEWOLU LADOJA CIRC
- Page 180 and 181:
SENATOR RASHIDI ADEWOLU LADOJA CIRC
- Page 184 and 185:
4
- Page 186:
Governor Seyi Makinde’s Remarks a
- Page 189 and 190:
And as we always say in Oyo State,
- Page 191 and 192:
1
- Page 193:
1
- Page 196 and 197:
TECHNICAL CHARACTERISTICS OF THE PR
- Page 200 and 201:
2
- Page 202 and 203:
22
- Page 204 and 205:
20
- Page 206 and 207:
20 Concrete Pavement
- Page 208 and 209:
20
- Page 210 and 211:
20
- Page 212 and 213:
22 Reconstruction of BCJ-Bailway-Gb
- Page 214 and 215:
Airport TrainStation OjoorBusTermin
- Page 216 and 217:
2
- Page 218 and 219:
2
- Page 220 and 221:
220
- Page 224 and 225:
4 His Excellency's Engr. Seyi Makin
- Page 226 and 227:
22 Omi Titun
- Page 229 and 230:
Omi Titun 22
- Page 231 and 232:
2
- Page 233 and 234:
One of the things we knew Ibadan ne
- Page 235:
Science supported the data; Oyo Sta
- Page 242 and 243:
2
- Page 245 and 246:
OYOSTATIE HE PACES TTER STATE TRANS
- Page 247:
CHALLENGE BUS TERMINAL Proposed Omi
- Page 251 and 252:
Omi Titun Bus Service: Phase 1 Ojoo
- Page 253 and 254:
CHALLENGE BUS TERMINAL Proposed Omi
- Page 255 and 256:
ASS TRANSIT Ill Giilalid J Bus Stop
- Page 257 and 258:
2
- Page 259 and 260:
2
- Page 261 and 262:
2
- Page 263 and 264:
2
- Page 265 and 266:
2
- Page 267 and 268:
2
- Page 269 and 270:
a I I , , I I , ' '' I 'I , • ' ,
- Page 271 and 272:
OYOSTATE INFRASTRUCTUREDEVELOPMENTS
- Page 273 and 274:
OYOSTATE 6 IBADANCIRCULARRD CRANEBU
- Page 275 and 276:
You may have read the Mckinsey repo
- Page 277 and 278:
For example, Peculiar Ultimate Conc
- Page 279 and 280:
2
- Page 281 and 282:
2
- Page 283 and 284:
2
- Page 285 and 286:
2
- Page 287 and 288:
Lagos-Ibadan Expressway Underpass 2
- Page 289 and 290:
2
- Page 291 and 292:
2
- Page 293 and 294:
2
- Page 295 and 296:
2
- Page 297 and 298:
2
- Page 299 and 300:
TRANSPORTATIONAGENDA OYOSTATE Airpo
- Page 301 and 302:
OYOSTATE FEDERALAIRPORTSAUTHORITYOF
- Page 303 and 304:
IBADAN AIRPORT ROAD DUALIZATION ---
- Page 305 and 306:
OYOSTATE C DR.VICTOROMOLOLU OLUNLOY
- Page 307 and 308:
AIRPORT ROAD COMMISSIONING OF AIRPO
- Page 309 and 310:
1 . . · ..... . J 0
- Page 311 and 312:
OYOSTATE 35 GOVERNORSEYIMAKINDE’S
- Page 313 and 314:
We have awarded the contract to con
- Page 315 and 316:
OYOSTATE ACCESSROADSTOTHEIBADANAIRP
- Page 317 and 318:
DR.VICTOROMOLOLUOLUNLOYOAIRPORTROAD
- Page 319 and 320:
TECHNICALBRIEFONDUALIZATIONOF AIRPO
- Page 321 and 322:
2
- Page 323 and 324:
PROPOSEDVISUALLANDMARKOMOLOLUOLUNLO
- Page 325 and 326:
OYOSTATE PROPOSED VISUAL LANDMARK A
- Page 327 and 328:
OYOSTATE PROPOSED VISUAL LANDMARK A
- Page 329 and 330:
MEDIA OYOSTATE COMMISIONINGOF AIRPO
- Page 331 and 332:
57 OYOSTATE BRIEFTECHNICALREPORTOFT
- Page 335 and 336:
GOVERNOR SEYI MAKINDE'S REMARKS AT
- Page 337 and 338:
emarks at the commissioning of the
- Page 339 and 340:
OYOSTATE SOMEONGOINGPROJECTS Recon
- Page 341 and 342:
I N F R A S T R U C T U R E D E V E
- Page 343 and 344:
INTEGRATED INFRASTRUCTURE DEVELOPME
- Page 345 and 346:
4
- Page 347 and 348:
OYOSl JE 'I■ Nl l il11'U■ 1,r
- Page 350 and 351:
UPCOMING GRAs OyoTown GRA Ogbomoso
- Page 352:
INFRASTRUCTURE DEVELOPMENT
- Page 356 and 357:
FLAG OFF EVENT MAY 2021
- Page 358 and 359:
NIGHT TIME
- Page 360 and 361:
THE ENGR. LERE ADIGUN G.R.A INFRAST
- Page 362 and 363:
• A mandatory 4-foot short intern
- Page 364:
ENGR. LERE ADIGUN GRA UPFRONT INFRA
- Page 367:
RECREATIONAL FACILITIES
- Page 370 and 371:
INFRASTRUCTURE DEVELOPMENT SUPPORTI
- Page 372 and 373:
SENATOR RASHIDI ADEWOLU LADOJA GRA
- Page 374 and 375:
4
- Page 376 and 377:
Construction Of Secondary Roads The
- Page 378 and 379:
D [I] DID D c.s P.O.W BLK PUBLIC E
- Page 380 and 381:
GSM LAND ASSET TO VALUE
- Page 383 and 384:
GUIISTHOUIIS
- Page 385 and 386:
Remarks by His Excellency Seyi Maki
- Page 387 and 388:
OYOSTATE THI PACll!SlfflA ITATI MIN
- Page 389:
OYOSTATE THI PACll!SlfflA ITATI Omi
- Page 392 and 393:
Industrial Park Advantages • A we
- Page 394 and 395:
-..about 1,400 Ha of premium indust
- Page 400 and 401:
PrimaryHealthCenters PHCs PRIMARYHE