26.12.2012 Views

Installation

Installation

Installation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION OF VF103 DOOR STATIONS<br />

These stations are best located adjacent to the front door or at the front gate at a<br />

suggested height of 1400 millimetres and may require a wall box depending upon the<br />

surface to which they are to be affixed.<br />

Any station exposed to the weather will require the fitting of a weatherproof cover.<br />

Where stations are to be installed in solid brick or concrete columns at a front gate, it is<br />

required that the cable be run in conduit from the station to below ground level and back to<br />

the house.<br />

When using 8-wire cable to connect to the Door Station, do not connect the spare two wires<br />

to the MUS1/MUS2 terminals at the Master Station (or Room Station) end of the cable.<br />

The two spare wires from an 8-wire cable may be wired in parallel to the POS and NEG<br />

wires to the gate station, to double the maximum cable distance to a length of 200 metres.<br />

Where a Door Station is part of a wiring loop, the Door Station should generally be the last<br />

station on the loop.<br />

BRICK<br />

REMOVED<br />

INSERT WALL BOX<br />

INTO OPENING<br />

WOOD FIXING SCREW (26mm)<br />

DOOR STATION – BRICK WALL<br />

WALL BOX<br />

BACK HOUSING<br />

WOOD FIXING SCREW (26mm)<br />

FASCIA<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!