Wilo brochure 2022
Protim supporting Wilo group to the digital future with BIM technology
Protim supporting Wilo group to the digital future with BIM technology
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
COORDINATION AND<br />
CLASH DETECTION<br />
Project coordination and clash detection are<br />
critical parts of the integrated BIM design<br />
process. At this point, all the inconsistencies and<br />
problems are coming out. It is a necessary<br />
process because several models are integrated<br />
into one BIM model. In the case of the current<br />
project, the high complexity of the systems and<br />
a big number of participants could cause<br />
multiple bigger and smaller mistakes,<br />
discovered only during the construction.<br />
More than 20 different design companies are<br />
involved in this project. They all use different<br />
software and must be coordinated in the same<br />
model to avoid all possible conflicts during<br />
construction. We coordinate in Navisworks and<br />
communicate weekly with all project teams.<br />
BENEFITS OF CLASH DETECTION<br />
Accurate engineering design<br />
documentation<br />
Fewer iterations during the construction<br />
phase<br />
Better coordination and collaboration<br />
between teams<br />
A streamlined and integrated approach<br />
11