Protim supporting Wilo group to the digital future with BIM technology
Protim supporting Wilo group to the digital future with BIM technology
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Our role is to provide formwork and<br />
reinforcement shop drawings first to the<br />
proofer for verification and then directly<br />
to the construction site.<br />
The main challenge is the high speed of<br />
changes (change in the construction<br />
type, architectural plans or MEP systems).<br />
DESIGNING CONCRETE<br />
STRUCTURES<br />
One of the peculiarities of this project is<br />
the high groundwater level. In<br />
collaboration with other structural teams<br />
taking part in the project, our structural<br />
engineers implemented a solution for a<br />
waterproofed connection of the existing<br />
building concrete structure to the new.<br />
The solution for the construction of a<br />
waterproof concrete foundation slab was<br />
implemented in the project. The problem<br />
solved there was a high heat release<br />
during the hardening process that could<br />
cause concrete cracking in large areas.<br />
Also, based on the preliminary design and<br />
calculations provided by Hellmich, our<br />
structural team developed the Vierendeel<br />
beam for eight meters-long cantilever.<br />
The main challenge in this project is<br />
the high speed of changes<br />
An additional level of complexity was<br />
added by the fact that construction<br />
started before the design phase was<br />
finished. That is why, all the changes that<br />
are happening, are important to<br />
implement and communicate with other<br />
participants as soon as possible.<br />
Apart from the fast velocity of work<br />
demanded, we have structural puzzles to<br />
solve in this project.<br />
9