CASEstudy<br />
THE SOLUTION<br />
KiwiRail's Digital Engineering<br />
transformational programme changes the<br />
way projects are being delivered and looks<br />
to leave the business with both physical<br />
assets and rich digital assets at the end of<br />
this watershed period of investment. A<br />
consistent approach to scaled<br />
collaboration environments across their<br />
portfolio is a key element to the delivery of<br />
these assets.<br />
Designs are now connected and<br />
coordinated in a single place and<br />
democratised information and 3D<br />
models are available for all - not just BIM<br />
specialists. Stakeholders can be<br />
brought into the Revizto environment to<br />
provide meaningful input into the<br />
design, and teams are more aligned<br />
and on the same page.<br />
NEXT-LEVEL COORDINATION<br />
WITH REVIZTO<br />
The scale of the W2QP project means there<br />
are a number of different workstreams at<br />
different stages in the lifecycle of a project.<br />
Due to tight completion timeframes the<br />
project has construction and design work<br />
happening at the same time. KiwiRail<br />
receives monthly as-built models and<br />
imports these into Revizto to coordinate<br />
with the proposed design models. This<br />
enables a next level of coordination for the<br />
project, further reducing the likelihood of<br />
issues needing to be resolved on site.<br />
REMOVING INTEROPERABILITY<br />
BARRIERS<br />
For KiwiRail and the W2QP project Revizto<br />
is more than just a platform for design<br />
information. It also manages as-built drone<br />
surveys, as-built models, existing<br />
underground services and rail specific track<br />
gauge clearance models, and Revizto is<br />
also able to host 3D models developed in<br />
bespoke rail specific sofware, such as<br />
overhead line models.<br />
Being able to bring 3D track clearance<br />
models into the platform allows the W2QP<br />
project to coordinate tight tolerances for<br />
overhead line and signal design at Wiri and<br />
Westfield junctions. These are the busiest<br />
junctions in New Zealand's rail network and<br />
therefore require a high level of accuracy<br />
when coordinating new assets.<br />
POWERFUL REVIZTO FEATURES<br />
FOR KIWIRAIL<br />
Mutiple Search Sets - Search sets in<br />
Revizto allow KiwiRail to democratise the<br />
large number of models and seign<br />
disciplnes on their projects, then make it<br />
available to a wider audience in one<br />
platform. Project teams who are not familiar<br />
with object trees are able to easily filter<br />
models through object properties or<br />
predefined areas, empowering KiwiRail with<br />
actionable insights.<br />
Custom Properties - Cusom Properties in<br />
Revizto is paramount to KiwiRail's success<br />
on W2QP. With an industry specific railway<br />
expertise comes the need for KiwiRail to<br />
think outside of the box with the traditional<br />
authoring tools and bring the specialist<br />
inputs of project stakeholders together<br />
through custom parameters in rail<br />
clearance models.<br />
Multi-stamping & Issue Tracking - Before<br />
Revizto, KiwiRail dealt with spreadsheetbased<br />
issue registers with no visual<br />
representation, resulting in ambiguity with<br />
team collaboration workflows. Issue<br />
Tracking solves this communications<br />
problem between KiwiRail's design and<br />
construction teams with predefined<br />
metadata, markup reviews, fault detection<br />
& data visualisations in granular detail.<br />
Favourites & Tooltips with Object-based<br />
Navigation - Access to quick, real-time<br />
data is immensely critical for the timesensitive<br />
project delivery of W2QP. KiwiRail<br />
utilises these two Revizto features to bring<br />
location-based data and visuals closer<br />
together as it switches between parallel<br />
workstreams to remove bottlenecks and<br />
zero in on the high-priority items in a<br />
compressed project timeline.<br />
"Revizto enables us to prioritise issues<br />
that need to be solved before schedule<br />
physical construction works," concluded<br />
Derek Jennings. "The teams work<br />
collaboratively to resolve all the issues in<br />
the digital world before construction<br />
begins: we are under huge time pressure,<br />
and there is no room for errors."<br />
www.revizto.com<br />