� DADO to participate in scheme verification with Irrigation Deveopment Divisions (IDDs) / Irrigation Development Sub-divisions (IDSDs) � DADO to participate in the FS and assist the study team with the agriculture information for project design on future cropping pattern and crop yield projection � DADO to prepare the agriculture –Sub-project Implementation Plan (SIP) with the participatory approach with WUA and farmers of the command area � DADO to get farmers group organized by outlet and tertiary level in the canal system with the assistance of NGO and Adhoc WUA and mobilize them for the preparotary activities of the agriculture development in the command area. � RAD of the respective region ( eastern and central region) to review the FSR( feasibility study report of the ISP- irrigation subproject) ,as comanager of RPSU with comments ,suggestions and recommendations to PAC ( project appraisal committee) � DDG of DOA, as a member of PAC ( Project Appraisal Committee) will look into the details of comments, suggestions and recommendation and make approval of the subproject for the implementation @= h=p=; ;+:yfut ljsf; tyf lj:t[t k|f?k (Detail design) : During the stage-II, the detail design of the subproject and strengthening of the WUA begins. the following are responsibility of projects pahse : � DADO to furnish the agriculture services with the preparatory agriculture activities as planned � DADO to update and revise, if it deems necessary, the agriculture –SIP ie ADP and get endorsed from the WUA- general assembly � DADO to send the revised\updated ADP to DOA\PIU for the inclusion in the annual program budgeting � RAD of the respective region to implement the agriculture activities/program as scheduled with the involvement of the farmers of - 23 _

ISP under CMIASP, particularly, the program review, planning and budgeting � DOA\PIU to develop the training materials for the farmers, and in particular, for the development of irrigated agriculture training materials for the farming community level agriculture assistants ( local agriculture extensionist) from among the leaders farmers of the ISP , mobilised by WUA in a sustainable way in the command area. #= l;+rfO ;+/rgf lgdf{0f M During the stage III, the subproject enters into the construction/rehabilitation process. DADO will continue to assist farmers of the command area rendering the agriculture services and conducting the agriculture activities/program planned and agreed (agriculture-SIP ie ADP) with the WUA and reporting to DOA\PIU. $= s[lif tyf ;fdflhs ljsf; sfo{qmd ;~rfng M During the stage IV- initial O&M and agriculture and social development, the responsibility of : � DADO to conduct the agriculture program/activities as depicted in ADP agreed and endorsed by WUA and reporting to DOA\PIU � RAD( Eastern and Centeal Region) to organize the CMIASP progress, planning workshop with the involvement of farmers from the ISP � DoA\PIU to organize the interaction workshop in each region on the CMIASP agriculture component and review and refine the ongoing agriculture activities in the ISP command area and strengthening the capacity building of WUA in mobilizing its trained local extentionist to the service to the entire farming community in the command area. � DADO to render technical and institutional support to the livelihood enahancement program /activities for the target groups identified and LEP developed for the implementation %= cfof]hgf ;~rfng, dd{t ;+ef/ / cg'udg M During the V stage of subproject development process, the further institutional support to WUA in the term of agriculture development will be envisaged. - 24 _

� DADO to participate in scheme verification with Irrigation Deveopment<br />

Divisions (IDDs) / Irrigation Development Sub-divisions (IDSDs)<br />

� DADO to participate in the FS and assist the study team with the<br />

agriculture information for project design on future cropping pattern and<br />

crop yield projection<br />

� DADO to prepare the agriculture –Sub-project Implementation Plan<br />

(SIP) with the participatory approach with WUA and farmers of the<br />

command area<br />

� DADO to get farmers group organized by outlet and tertiary level in the<br />

canal system with the assistance of NGO and Adhoc WUA and mobilize<br />

them for the preparotary activities of the agriculture development in the<br />

command area.<br />

� RAD of the respective region ( eastern and central region) to review the<br />

FSR( feasibility study report of the ISP- irrigation subproject) ,as comanager<br />

of RPSU with comments ,suggestions and recommendations to<br />

PAC ( project appraisal committee)<br />

� DDG of DOA, as a member of PAC ( Project Appraisal Committee) will<br />

look into the details of comments, suggestions and recommendation and<br />

make approval of the subproject for the implementation<br />

@= h=p=; ;+:yfut ljsf; <strong>tyf</strong> lj:t[t k|f?k (Detail design) : During the stage-II,<br />

the detail design of the subproject and strengthening of the WUA begins. the<br />

following are responsibility of projects pahse :<br />

� DADO to furnish the agriculture services with the preparatory<br />

agriculture activities as planned<br />

� DADO to update and revise, if it deems necessary, the agriculture –SIP<br />

ie ADP and get endorsed from the WUA- general assembly<br />

� DADO to send the revised\updated ADP to DOA\PIU for the inclusion<br />

in the annual program budgeting<br />

� RAD of the respective region to implement the agriculture<br />

activities/program as scheduled with the involvement of the farmers of<br />

- 23 _