Commissioning Report

Commissioning Report Commissioning Report

10.06.2022 Views

COMMISSIONING REPORTForm No.: WZSMS-M2201-QAC-F-022Rev.: 00Date:31-May-22Page:1 of 1Project Title: EPCC for TWPP FOR Sarawak Methanol ProjectContract No.: SP/EPCC/P1/2021/007Report no.: MS-M2201-QAQC-CMM-R-Date:OWNER: SARAWAK PETCHEM SDN. BHD.Pipeline section:Type of operation:Service Line Feeder Line Distribution LineItemCheck Point Location Date/Time Status (Acc/Rej) RemarksEquipment Serial No. Calibration Date Certificate No.VERIFICATIONWe hereby verify that the item(s) described above has been inspected, tested and complies with the term of the order.QC Inspector:OWNER Representative:Signature : Signature :Name : Name :Date : Date :*NOTE :All verification must complete with stamp

COMMISSIONING REPORT

Form No.: WZSMS-M2201-QAC-F-022

Rev.: 00

Date:

31-May-22

Page:

1 of 1

Project Title: EPCC for TWPP FOR Sarawak Methanol Project

Contract No.: SP/EPCC/P1/2021/007

Report no.: MS-M2201-QAQC-CMM-R-

Date:

OWNER: SARAWAK PETCHEM SDN. BHD.

Pipeline section:

Type of operation:

Service Line Feeder Line Distribution Line

Item

Check Point Location Date/Time Status (Acc/Rej) Remarks

Equipment Serial No. Calibration Date Certificate No.

VERIFICATION

We hereby verify that the item(s) described above has been inspected, tested and complies with the term of the order.

QC Inspector:

OWNER Representative:

Signature : Signature :

Name : Name :

Date : Date :

*NOTE :All verification must complete with stamp

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!