VV june july 2022
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Bus Shelter at the B3058/
Downton Junction
The wooden bus shelter has now been
placed at the B3058/Downton Lane
Junction. The area has been made good
by HCC Highways and has become a
more fitting gateway to the village.
funds linked to the development of “The
Swifts”.
Also, as part of the funds available, two
bridges in the Lower Pleasure Grounds
near to Mill Meadow Pond will be
replaced.
The cost of this project was met from
Developers Contributions and a
contribution from Shorefield Holidays
Limited.
MEG Bridge, Boardwalk and Steps
Over many years the MEG Bridge,
Boardwalk and Steps to Blackbush Road
have deteriorated, this is in spite of
valiant efforts by the MVC to keep it in a
safe condition for use. It is a very
popular route for walkers using the
Upper Pleasure Grounds from Sharvells
Copse.
Although it is hoped the work can start
in the Autumn/Winter this has yet to be
confirmed. It is uncertain at this moment
in time whether the MEG Bridge,
Boardwalk and Steps to Blackbush Road
need to be closed off due to the risk
associated with using this route. A
decision will be made at the May Parish
Council meeting.
Greening Campaign
The good news is that funds should be
available to undertake major repairs to
the bridge, boardwalk and steps. These
funds will largely be met from mitigation
The Greening Campaign Public meeting
scheduled for the end of March was
deferred to show solidarity and support
for the New Forest for Ukraine meeting
scheduled for the same day and time. We
will be advising of a new date when
available.
In the meantime we have been active. We
have met with Milford on Sea …..
Please mention The Village Voice when responding to adverts
37