plates). A secondary review may be required in accordance with risk

management principles. In some cases this review may need to be performed

in real-time. Suitable electronic means of verifying critical data may be an

acceptable alternative, e.g. taking photograph images of the data for

retention.

This verification should be conducted after performing production-related

tasks and activities and be signed or initialled and dated by the appropriate

persons.

Local SOPs should be in place to describe the process for review of written

documents.

Specific elements that should be checked when reviewing records:

Verify the process for the handling of production records within

processing areas to ensure they are readily available to the correct

personnel at the time of performing the activity to which the record

relates.

Verify that any secondary checks performed during processing were

performed by appropriately qualified and independent personnel, e.g.

production supervisor or QA.

Check that documents were reviewed by production personnel and

then quality assurance personnel following completion of operational

activities.

Item How should records be verified?

2. Expectation

Check that all the fields have been completed correctly using the current

(approved) templates, and that the data was critically compared to the

acceptance criteria.

Check items 1, 2, 3, and 4 of section 8.6 and Items 1 and 2 of section 8.7

Specific elements that should be checked when reviewing records:

Inspectors should review company procedures for the review of

manual data to determine the adequacy of processes.

The need for, and extent of a secondary check should be based on

quality risk management principles, based on the criticality of the data

generated.

Check that the secondary reviews of data include a verification of any

calculations used.

View original data (where possible) to confirm that the correct data

was transcribed for the calculation.