CM 420 – TEMPORARY STRUCTURES LESSON 4: COFFERDAMS<br />
Figure 6 – Cofferdam construction sequence (I). (a) Pre-dredge. (b) Drive support piles; set<br />
prefabricated bracing frame and hang from support piles. (c) Set sheet piles; drive sheet piles;<br />
block and tie sheet piles to top wale.<br />
11. Check blocking between bracing and sheets (Fig. 8a).<br />
12. Dewater (Fig. 8a).<br />
13. Construct new structure (Fig. 8a and b).<br />