CM 420 – TEMPORARY STRUCTURES LESSON 4: COFFERDAMS<br />

Figure 7 – Cofferdam construction sequence (II). (a) Excavate initial and final grade. (b)<br />

Drive bearing piles in place. (c) Place tremie concrete.<br />

14. Flood cofferdam (Fig. 8b).<br />

15. Remove sheet piles (Fig. 8c).<br />

16. Remove bracing (Fig. 8c).<br />

17. Backfill (Fig. 8c).<br />