Other Important Projects Executed<br />

Projects Capacity Completion<br />

Year<br />

Stacker Reclaimer and Wagon Loader, Kiriburu<br />

Iron Ore Mines, NMDC<br />

1500 TPH 1975<br />

Stacker Reclaimer and Wagon Loader, Baladila<br />

Iron Ore Mines, NMDC<br />

2500 TPH 1975<br />

Coal Handling Complex, Bongaigaon Thermal<br />

Power Plant, Assam<br />

400 TPH<br />

Wagon Tippler Complex, IISCO Burnpur 1200 TPH 1980<br />

Sponge Iron Pilot Plant, RDCIS Ranchi, SAIL 100 TPD 1982<br />

New Hammer Mill Project, Durgapur Steel Plant,<br />

Durgapur<br />

400 TPH 1986<br />

Wagon Tippler Complex, Patratu Thermal Power<br />

Plant, BSEB<br />

700 TPH 1987<br />

Chhatak Cement Plant, Sylhet, Bangladesh 250 TPD 1987<br />

3rd Slab Yard, Bokaro Steel Limited 1996<br />

Projects under Execution<br />

Ore Handling Plant, Part- A, PKG-060 BSP Bhilai<br />

Rotary Wagon Tripler, IISCO<br />

Chhatak Cement Plant, Bangladesh<br />

Scope : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Handling<br />

Plant on Turnkey basis.<br />

Major Equipment : Wagon Tippler, Side Arm Charger, Electric Pusher Car, Twin Boom Stacker, Bucket Wheel Reclaimer, complete utilities etc.<br />

Conveyor system of 1500 TPH capacity of approx. 5.0 km length.<br />

Ore Bedding & Blending Plant, PKG-090 RSP Rourkela<br />

Scope : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Bedding and<br />

Blending Plant & Base Blending facilities on Turnkey basis.<br />

Major Equipment : Wagon Tippler, Side Arm Charger, Paddle feeder, Apron feeder, Hammer Crusher, Double Roll Crusher, Screens,<br />

Twin Boom Stacker, Bucket Wheel Reclaimer, Blender Reclaimer, Transfer Car, complete utilities etc.<br />

Conveyor system of 1500 TPH capacity of approx. 14.0 km length.<br />

New Coal Ha 2 BSP Bhilai<br />

Scope : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of New Coal<br />

Handling Plant on Turnkey basis.<br />

Major Equipment : Wagon Tippler, Side Arm Charger, Belt feeders, Weigh feeders, Electric Pusher Cars (3 Nos.), Stacker cum Reclaimer<br />

(5 Nos.), complete utilities etc.<br />

Conveyor system up to 1500 TPH capacity of approx. 7.5 km length.<br />

5.0 MTPA Madhuband Coal Washery, BCCL Dhandad<br />