TURNKEY PROJECTS Project & Consultancy Services Division was set up in the year 1975 to execute turnkey projects. Now, this wing is known as Project Division. It provides broad spectrum services of Engineering, Design, Manufacture and Supply, Erection, Testing and Commissioning of Raw Material/Coal Handling Plants for coal, steel, power and other core sectors. Concept to Commissioning encompasses Feasibility studies and Site selection, Basic Engineering with Process Flow Sheets, Energy and Process Equipment, Erection, Testing and Commissioning of Plant & Equipment. Fields of specialisation � Material Handling Plant � Coal Handling Plant � Coal Washeries � Low Temperature Carbonisation Plant and Gas Treatment Plant � Sinter Plant � Continuous Casting Plant for Billets, Slabs and Blooms � Rolling Mill � Cement Plant Major Projects executed Dankuni Coal Complex, CIL Projects Capacity Completion Year Coal Handling Plant, PARICHHA Thermal Power Station (UPSEB) 675 TPH 1984 Jayant CHP, Northern Coal Fields Ltd. 1200 TPH 1985 Dankuni Coal Complex, Coal India Ltd. Up to 1000 TPH 1991 Wheel And Axle Plant, Durgapur Steel Plant Lime Storage & Screening Plant, Bokaro Steel Plant Raw Material Handling System (Ph-II), Rourkela Steel Plant 1 million Wheels/ Year 1994 1500 TPH 1996 Up to 1200 TPH 1996 Coal Preparation Plant, Kedla, Central 650 TPH 1997 Continuous Casting Plant, Rourkela Steel Plant 0.3 MT of continuous Slabs 1997 Raw Material Handling System, NINL Up to 1000 TPH 2001 Second Launching Pad, ISRO 2006 Coal Handling Plant (Ph-II), Nigahi, Northern Coal Fields Ltd. Coal Handling Plant (1600 TPH) for Nigahi Project, NCL, Singrauli 1600 TPH 2009

Other Important Projects Executed Projects Capacity Completion Year Stacker Reclaimer and Wagon Loader, Kiriburu Iron Ore Mines, NMDC 1500 TPH 1975 Stacker Reclaimer and Wagon Loader, Baladila Iron Ore Mines, NMDC 2500 TPH 1975 Coal Handling Complex, Bongaigaon Thermal Power Plant, Assam 400 TPH Wagon Tippler Complex, IISCO Burnpur 1200 TPH 1980 Sponge Iron Pilot Plant, RDCIS Ranchi, SAIL 100 TPD 1982 New Hammer Mill Project, Durgapur Steel Plant, Durgapur 400 TPH 1986 Wagon Tippler Complex, Patratu Thermal Power Plant, BSEB 700 TPH 1987 Chhatak Cement Plant, Sylhet, Bangladesh 250 TPD 1987 3rd Slab Yard, Bokaro Steel Limited 1996 Projects under Execution Ore Handling Plant, Part- A, PKG-060 BSP Bhilai Rotary Wagon Tripler, IISCO Chhatak Cement Plant, Bangladesh Scope : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Handling Plant on Turnkey basis. Major Equipment : Wagon Tippler, Side Arm Charger, Electric Pusher Car, Twin Boom Stacker, Bucket Wheel Reclaimer, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 5.0 km length. Ore Bedding & Blending Plant, PKG-090 RSP Rourkela Scope : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of Ore Bedding and Blending Plant & Base Blending facilities on Turnkey basis. Major Equipment : Wagon Tippler, Side Arm Charger, Paddle feeder, Apron feeder, Hammer Crusher, Double Roll Crusher, Screens, Twin Boom Stacker, Bucket Wheel Reclaimer, Blender Reclaimer, Transfer Car, complete utilities etc. Conveyor system of 1500 TPH capacity of approx. 14.0 km length. New Coal Ha 2 BSP Bhilai Scope : Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run and Commissioning of New Coal Handling Plant on Turnkey basis. Major Equipment : Wagon Tippler, Side Arm Charger, Belt feeders, Weigh feeders, Electric Pusher Cars (3 Nos.), Stacker cum Reclaimer (5 Nos.), complete utilities etc. Conveyor system up to 1500 TPH capacity of approx. 7.5 km length. 5.0 MTPA Madhuband Coal Washery, BCCL Dhandad TURNKEY PROJECTS

TURNKEY PROJECTS<br />

Project & Consultancy Services Division was set up<br />

in the year 1975 to execute turnkey projects. Now,<br />

this wing is known as Project Division. It provides<br />

broad spectrum services of Engineering, Design,<br />

Manufacture and Supply, Erection, Testing and<br />

Commissioning of Raw Material/Coal Handling<br />

Plants <strong>for</strong> coal, steel, power and other core<br />

sectors. Concept to Commissioning encompasses<br />

Feasibility studies and Site selection, Basic<br />

Engineering with Process Flow Sheets, Energy<br />

and Process Equipment, Erection, Testing and<br />

Commissioning of Plant & Equipment.<br />

Fields of specialisation<br />

� Material Handling Plant<br />

� Coal Handling Plant<br />

� Coal Washeries<br />

� Low Temperature Carbonisation Plant and Gas<br />

Treatment Plant<br />

� Sinter Plant<br />

� Continuous Casting Plant <strong>for</strong> Billets, Slabs and<br />

Blooms<br />

� Rolling Mill<br />

� Cement Plant<br />

Major Projects executed<br />

Dankuni Coal Complex, CIL<br />

Projects Capacity Completion<br />

Year<br />

Coal Handling Plant, PARICHHA<br />

Thermal Power Station (UPSEB)<br />

675 TPH 1984<br />

Jayant CHP, Northern Coal Fields Ltd. 1200 TPH 1985<br />

Dankuni Coal Complex, Coal India Ltd. Up to 1000 TPH 1991<br />

Wheel And Axle Plant, Durgapur Steel<br />

Plant<br />

Lime Storage & Screening Plant,<br />

Bokaro Steel Plant<br />

Raw Material Handling System (Ph-II),<br />

Rourkela Steel Plant<br />

1 million Wheels/<br />

Year<br />

1994<br />

1500 TPH 1996<br />

Up to 1200 TPH 1996<br />

Coal Preparation Plant, Kedla, Central 650 TPH 1997<br />

Continuous Casting Plant, Rourkela<br />

Steel Plant<br />

0.3 MT of<br />

continuous Slabs<br />

1997<br />

Raw Material Handling System, NINL Up to 1000 TPH 2001<br />

Second Launching Pad, ISRO 2006<br />

Coal Handling Plant (Ph-II), Nigahi,<br />

Northern Coal Fields Ltd.<br />

Coal Handling Plant (1600 TPH) <strong>for</strong> Nigahi Project, NCL, Singrauli<br />

1600 TPH 2009