24.12.2012 Views

4 General Technical Specification of Bhilai Steel Plant, SAIL ...

4 General Technical Specification of Bhilai Steel Plant, SAIL ...

4 General Technical Specification of Bhilai Steel Plant, SAIL ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

© 2007 MECON Limited<br />

All rights reserved<br />

<strong>General</strong> <strong>Technical</strong> <strong>Specification</strong><br />

vii) Tolerance for clearance between flanges and flange rings :<br />

Not more than 2 mm.<br />

05 Erection <strong>of</strong> valves and fittings<br />

- Before erection, the valves, cocks and other fittings, to be mounted on pipelines,<br />

shall be dismantled, cleaned, oiled and reassembled. Glands shall be packed<br />

with suitable materials as per approved drawings.<br />

- All moving parts <strong>of</strong> the pipe fittings should move freely without jamming.<br />

- Valves shall be tested hydraulically for leakage by applying pressure on up<br />

stream side with valve in closed position.<br />

- Bolts & nuts shall be cleaned and lightly oiled.<br />

- Proper grades <strong>of</strong> gaskets shall be used for erection as per approved drawings.<br />

Testing <strong>of</strong> BF Gas, Cold Blast, Nitrogen, Instrument Air, Steam and LPG pipelines<br />

- Preliminary acceptance test for erected pipelines shall be carried out as follows :<br />

a) Checking <strong>of</strong> metal marked as per manufacturer’s certificate/ approved drawings.<br />

b) Checking <strong>of</strong> test result <strong>of</strong> mechanical tests for welding/ radiographic tests.<br />

c) Visual examination <strong>of</strong> welds.<br />

d) Dimensional checks as per the approved erection drawings.<br />

e) Checking <strong>of</strong> welded joints by chalk kerosene test.<br />

- In case defects are found by visual examination, these shall be rectified prior to<br />

leakage test.<br />

- Checking <strong>of</strong> proper installation <strong>of</strong> supports, expansion joints, valves and fittings.<br />

- The pipeline shall be cleaned from inside, all debris removed and pipeline blown<br />

with air to remove all dirt, rust particles, etc.<br />

Strength and leakage test for BF gas, Cold Blast, Nitrogen, Instrument air, Steam and<br />

LPG pipelines :<br />

Test fluid for BF gas, Cold blast and LPG shall be air and for Nitrogen, Instrument air &<br />

Steam service pipelines, test fluid shall be water.<br />

All mounted equipment / instruments, control valves, etc. on pipelines shall be<br />

temporarily replaced by spool pieces. End connection near equipment connection shall<br />

be temporarily disconnected and blanked.<br />

For BF gas, test pressure equivalent to 1.25 times the maximum operating pressure but<br />

not less than 0.2 Kgf/cm 2 (g) shall be applied using air as per the certified<br />

drawings and instructions <strong>of</strong> OWNER/ MECON for ascertaining the strength.<br />

For cold blast, compressed air, nitrogen & LPG test pressure shall be 1.25 times the<br />

maximum working pressure.<br />

For steam service pipelines test pressure shall be 1.5 times the maximum working<br />

pressure.<br />

a) For BF gas, cold blast, compressed air, nitrogen & LPG pressure test shall be carried out<br />

by maintaining the test pressure indicated above for a minimum period <strong>of</strong> 1/2 hour. For<br />

steam pipes, the minimum duration shall also be 1/2 hour.<br />

Gases & Liquid Fluids<br />

Page 45 <strong>of</strong> 51<br />

GS-02

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!