© 2007 MECON Limited<br />

All rights reserved<br />

<strong>General</strong> <strong>Technical</strong> <strong>Specification</strong><br />

Item Size Range Description Dimensional/<br />

Design<br />

Standard<br />

Fire<br />

Breaker<br />

Fittings<br />

Flanges<br />

Gases & Liquid Fluids<br />

Page 42 <strong>of</strong> 51<br />

Material -<br />

Carbon <strong>Steel</strong><br />

DN 300 to 600 Seamless BE Sch.40 B36.10 ASTM A106 GR.B<br />

DN 50 to 150 Copper Pipe B36.10 Deoxidised non<br />

Arsenic Copper<br />

DN 200 to 600 Copper Pipe B36.10 Deoxidised non<br />

Arsenic Copper<br />

DN 15 to 40 SW Fittings<br />

# 3000<br />

ANSI B 16.11 ASTM A 105<br />

DN 50 and above BW Fittings ANSI B16.9 ASTM A234 Gr WPB<br />

DN 15 to 40<br />

SW:RF : Serrated Finish; B 16.5 ASTM A 105<br />

DN 50 and above WNRF : Serrated Finish B 16.5 ASTM A 105<br />

Gaskets All sizes PTFE LOX GRADE B16.21<br />

Valves<br />

DN 15 to 40 Ball valve class 800 for<br />

isolation purpose flanged<br />

ends (class 300)<br />

DN 50 and above Ball valve class 300 for<br />

isolation purpose flanged<br />

ends (class 300)<br />

DN 15 to 40 Globe valve class 800 for<br />

throttling purpose, Flanged<br />

ends (class 300)<br />

DN 50 and above Globe valve class 300 for<br />

throttling purpose, Flanged<br />

ends (class 300)<br />

DN 15 to 40 Check valve class 800, with<br />

flanged ends (class 300)<br />

DN 50 and above Check valve class 300 with<br />

flanged ends<br />

BS 5351 Body A182 GR. 304;<br />

/BRONZE ;13% Cr<br />

Trim / BRONZE<br />

API 600 Body A351 GR. CF8;<br />

/BRONZE ; Trim:13%<br />

Cr / BRONZE<br />

BS 5352 Body: Bronze<br />

Trim: Bronze<br />

BS 1873 Body: Bronze<br />

Trim: Bronze<br />

BS 5352 Body A182 GR. 304;<br />

/BRONZE ;trim 13%<br />

Cr / BRONZE<br />

BS 1868 Body A351 GR. CF8;<br />

/BRONZE ; Trim:13%<br />

Cr / BRONZE<br />

A) Erection <strong>of</strong> BF Gas, Cold Blast, Nitrogen, Instrument Air, Steam and LPG<br />

Pipelines<br />

01 <strong>General</strong><br />

02 Before erection, the equipment, valves and other fittings to be mounted on<br />

pipelines/ equipment should be dismantled, (only if required), cleaned, oiled and<br />

reassembled. Glands shall be packed with suitable materials as per approved<br />

drawings.<br />

- All elements <strong>of</strong> the pipelines system shall be erected at site strictly as per the<br />

drawings approved by the / Consultant.<br />

- Any modification to be carried out at site, shall have the prior approval <strong>of</strong> /<br />

Consultant’s representatives.<br />

- While erecting, pipelines shall rest uniformly on each support. Yokes, if<br />

provided, shall not allow lateral movement <strong>of</strong> pipes.<br />