© 2007 MECON Limited<br />

All rights reserved<br />

C : FOR STEAM<br />

<strong>General</strong> <strong>Technical</strong> <strong>Specification</strong><br />

Sl.<br />

No<br />

Fluid Condition<br />

Average Velocity, m/sec<br />

Up to DN 50 to DN 200mm<br />

DN 50mm DN 150mm and above<br />

1 SATURATED AT SUB-<br />

ATMOSPHERIC<br />

PRESSURE<br />

- 10 – 15 15 – 20<br />

2 SATURATED AT 1 TO 7<br />

Kgf/cm 2 (g)<br />

15 – 22 20 – 33 25 – 43<br />

3 SATURATED ABOVE 7<br />

Kgf/cm 2 (g)<br />

15 – 25 20 – 35 30 – 50<br />

4 SUPERHEATED UPTO 7<br />

Kgf/cm 2 (g)<br />

20 – 30 25 – 40 30 – 50<br />

5 SUPERHEATED ABOVE<br />

7 TO 35 Kgf/cm 2 (g)<br />

20 - 33 28 – 43 35 - 55<br />

Gases & Liquid Fluids<br />

Page 7 <strong>of</strong> 51<br />

Remarks<br />

Steam piping network comes under the purview <strong>of</strong> IBR and thickness calculation shall be<br />

carried-out as per stipulations indicated in IBR and approval <strong>of</strong> CIB shall be obtained.<br />

02.05. EXPANSION AND FLEXIBILITY.<br />

All Pipe work shall be designed to provide sufficient flexibility against thermal expansion<br />

to prevent development <strong>of</strong> undesirable forces and moments at points <strong>of</strong> connection to<br />

equipment, at anchorage or at guide points.<br />

As far as possible, flexibility shall be provided by planning route with change <strong>of</strong> direction<br />

or by the use <strong>of</strong> bends, loops or <strong>of</strong>f-sets.<br />

Whenever self-compensation can not be achieved by pipe routing, provision for thermal<br />

expansion shall be made by providing expansion loops or expansion joints as per<br />

following criteria:<br />

• U loops shall be provided for all low pressure fuel gas piping up to DN 300 size<br />

and high pressure piping for all sizes.<br />

• For high pressure piping, where U-loop is not possible, bellow type expansion<br />

joint shall be provided. Bellow type compensators shall also be provided in low<br />

pressure gas lines.<br />

While locating the expansion joints following guidelines should be followed:<br />

• Bellow compensators should be located preferably in the center <strong>of</strong> two fixed<br />

points.<br />

• U-Compensators should be located in between two fixed points with variation in<br />

pipe lengths in the ratio <strong>of</strong> 1:2 (max).<br />

• Gland Compensators should be located near the fixed supports to facilitate<br />

smooth functioning.<br />

• Bellow and gland compensators shall have flanged connection with pipes<br />

GS-02