C : FOR STEAM<br />
<strong>General</strong> <strong>Technical</strong> <strong>Specification</strong><br />
Sl.<br />
No<br />
Fluid Condition<br />
Average Velocity, m/sec<br />
Up to DN 50 to DN 200mm<br />
DN 50mm DN 150mm and above<br />
1 SATURATED AT SUB-<br />
ATMOSPHERIC<br />
PRESSURE<br />
- 10 – 15 15 – 20<br />
2 SATURATED AT 1 TO 7<br />
Kgf/cm 2 (g)<br />
15 – 22 20 – 33 25 – 43<br />
3 SATURATED ABOVE 7<br />
Kgf/cm 2 (g)<br />
15 – 25 20 – 35 30 – 50<br />
4 SUPERHEATED UPTO 7<br />
Kgf/cm 2 (g)<br />
20 – 30 25 – 40 30 – 50<br />
5 SUPERHEATED ABOVE<br />
7 TO 35 Kgf/cm 2 (g)<br />
20 - 33 28 – 43 35 - 55<br />
Gases & Liquid Fluids<br />
Page 7 <strong>of</strong> 51<br />
Remarks<br />
Steam piping network comes under the purview <strong>of</strong> IBR and thickness calculation shall be<br />
carried-out as per stipulations indicated in IBR and approval <strong>of</strong> CIB shall be obtained.<br />
02.05. EXPANSION AND FLEXIBILITY.<br />
All Pipe work shall be designed to provide sufficient flexibility against thermal expansion<br />
to prevent development <strong>of</strong> undesirable forces and moments at points <strong>of</strong> connection to<br />
equipment, at anchorage or at guide points.<br />
As far as possible, flexibility shall be provided by planning route with change <strong>of</strong> direction<br />
or by the use <strong>of</strong> bends, loops or <strong>of</strong>f-sets.<br />
Whenever self-compensation can not be achieved by pipe routing, provision for thermal<br />
expansion shall be made by providing expansion loops or expansion joints as per<br />
following criteria:<br />
• U loops shall be provided for all low pressure fuel gas piping up to DN 300 size<br />
and high pressure piping for all sizes.<br />
• For high pressure piping, where U-loop is not possible, bellow type expansion<br />
joint shall be provided. Bellow type compensators shall also be provided in low<br />
pressure gas lines.<br />
While locating the expansion joints following guidelines should be followed:<br />
• Bellow compensators should be located preferably in the center <strong>of</strong> two fixed<br />
points.<br />
• U-Compensators should be located in between two fixed points with variation in<br />
pipe lengths in the ratio <strong>of</strong> 1:2 (max).<br />
• Gland Compensators should be located near the fixed supports to facilitate<br />
smooth functioning.<br />
• Bellow and gland compensators shall have flanged connection with pipes<br />
GS-02