All rights reserved<br />

<strong>General</strong> <strong>Technical</strong> <strong>Specification</strong><br />

temporary loads and minimum earth covering <strong>of</strong> 1000mm in areas not subject to<br />

temporary loads, unless otherwise specified.<br />

22. For the pipelines laid on ro<strong>of</strong>, the distance from the external edge <strong>of</strong> the pipe to<br />

the ro<strong>of</strong> shall be at least 0.5m.<br />

23. All shop headers, except for gravity fluids, shall be generally routed along<br />

columns in multiple rows at a height 4 to 6m above floor level. The connections<br />

to equipment shall be taken through suitable covered floor trenches for shops at<br />

ground floor and for basements, for elevated operating floors, the equipment<br />

pipe work connection may be taken below the floor level. All isolated single pipe<br />

connections to equipment shall be buried in the flooring / equipment foundations.<br />

Pipe work from basement and oil cellars to main equipment shall be routed in<br />

pipe tunnels / trenches with adequate spacing for easy maintenance. All pipe<br />

trenches shall be covered by chequered plate or by concrete slabs.<br />

24. The bleeder pipes for purging lines and other exhaust pipe work shall be routed<br />

upward along columns / gable ends and / or walls to a minimum height <strong>of</strong><br />

4,000mm above the ro<strong>of</strong> level / platforms.<br />

25. For the gas pipelines laid along the building walls, the clearance between the<br />

gas pipelines and the wall shall be adopted so as to ensure the possibility for<br />

maintenance <strong>of</strong> the gas pipelines. The gas pipelines laid on the walls must not<br />

cross the window and door openings.<br />

26. Branch pipes from the headers to the building through walls and the ro<strong>of</strong> shall be<br />

encased.<br />

27. Gas pipelines shall be earthed. When laid under the high voltage lines, a<br />

protective sheet guarding shall be provided above the gas pipelines. The<br />

guarding shall be earthed. The earthing resistance must be not over 10 ohm.<br />

28. Platforms, access ladders, hand railing, etc. shall be provided for operation and<br />

maintenance <strong>of</strong> valves, instruments and controls. Manholes and hatches shall be<br />

provided for access inside the gas pipelines.<br />

29. At all the places <strong>of</strong> regular maintenance (gate valves, throttle valves, orifice<br />

plates, hatches, manholes, bleeders, etc.) if located at a height <strong>of</strong> over 2.5m<br />

from the maintenance level, provision shall be made for stationary platforms with<br />

the railings and stairs / ladders.<br />

30. To ensure the condensate drainage, the gas pipelines shall be laid with a<br />

gradient <strong>of</strong> about 0.005 towards the water drains.<br />

Condensate drains shall be equipped with bleeders.<br />

Necessary water pipe work for condensate seal pot shall be provided.<br />

31. Flash back arrestors shall be provided in each section <strong>of</strong> the pipe work for<br />

acetylene and LP gas to prevent flame propagation or pressure surges. They<br />

may be <strong>of</strong> hydraulic / cartridge type flash back arrestors or back pressure valves.<br />

32. All branch pipes from main header shall be connected through a hydraulic<br />

arrestor.<br />

Gases & Liquid Fluids<br />

Page 4 <strong>of</strong> 51<br />