© 2007 MECON Limited<br />

All rights reserved<br />

<strong>General</strong> <strong>Technical</strong> <strong>Specification</strong><br />

a) Additional pipes on existing gas pipes will be allowed to be laid only<br />

with the permission <strong>of</strong> concerned plant personnel.<br />

b) In each case, the gas pipes and supporting structures shall be checked<br />

with due consideration for additional loads and practical state <strong>of</strong> the<br />

metal structure <strong>of</strong> gas pipes.<br />

c) When installing with pipes carrying corrosive fluids they shall be kept at<br />

least 500 mm below or by the side <strong>of</strong> the gas pipe at a distance <strong>of</strong><br />

500mm.<br />

If flange joints are provided on pipes carrying corrosive liquids, it is<br />

necessary to mount protective baffle plate against falling <strong>of</strong> corrosive<br />

liquids on gas pipes and their supports.<br />

d) The associated gas pipes at the places on gas pipes where valves and<br />

other devices are mounted, should be kept at a minimum 800 mm<br />

distance from the main pipe.<br />

e) Drainage <strong>of</strong> the associate pipes should be laid to one side at a distance<br />

so that condensate does not fall on gas pipes/ its accessories,<br />

supporting structures and their elements, etc.<br />

06. The branch line should generally be installed outside building along ro<strong>of</strong> wall.<br />

Branch line having diameter less than 500 mm may be laid inside shop building.<br />

07. Branch line from gas main entering into building through building wall should<br />

pass through casings. Internal clearance between casing and pipe should be<br />

suitably filled up, wherever required.<br />

08. Gas branch line from gas main passing through ro<strong>of</strong> covering should have<br />

circular opening. For this purpose, a circular opening should be made on ro<strong>of</strong><br />

and a taper hood should be provided on the branch line above the ro<strong>of</strong> for<br />

protection from rain.<br />

09. Shop headers (except headers <strong>of</strong> By-product <strong>Plant</strong>) should be mounted at a<br />

height having minimum ground clearance <strong>of</strong> 4500 mm, when laying them outside<br />

the building wall.<br />

10. Layout <strong>of</strong> gas consuming units in various shops should be such that it is<br />

possible to bring the gas pipes above ground.<br />

11. Gas pipes <strong>of</strong> coke oven, natural gas and also their mixtures with blast furnace<br />

gas may be installed in channels and casings, in the region <strong>of</strong> gas supply to<br />

furnace and other consuming units.<br />

The following conditions should be observed for this purpose :<br />

a) Clearance between wall and bottom should be at least 400 mm, and for gas<br />

pipes <strong>of</strong> 200 mm and below clearances should not be less than the gas pipe<br />

diameter.<br />

b) Installation <strong>of</strong> flanges, threaded joints and accessories (except accessories for<br />

removal <strong>of</strong> condensate on a pipeline) is not allowed when it is laid in a channel.<br />

The number <strong>of</strong> welds on such gas pipes should be restricted to a minimum.<br />

Gases & Liquid Fluids<br />

Page 2 <strong>of</strong> 51<br />

GS-02