Project HSSE Management Planning

10. Waste Management Plan

Project waste management generally employs the “3R process”—reduce, reuse,

recycle—to address environmental management

The project waste management plan details the controls to be applied to each particular

category of waste, ranging from general office waste (paper, etc.), food waste (from site

canteens), sanitary waste (from site welfare facilities), to the different categories of waste

generated by construction processes (excavations, metal, packaging, lumber, etc.).

• Discharge of wastewater during excavation into adjacent watercourse, where some

degree of primary treatment is required (water treatment plants, settlement ponds, etc.)

for the removal of suspended solids or other environmentally harmful constituent.

• Excavated material, where waste enforcement authorities are empowered to assess the

performing organization's controls for disposal controls and waste manifest system; that

is, the determination of how much waste is placed in authorized areas.

• Construction and demolition waste generated on site, which may require a formal plan

for treatment of the debris and separation for potential recycling or reuse.