02.04.2022 Views

Abebe EQA Training document

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Integration Management

4.6 PERFORM INTEGRATED CHANGE CONTROL

Before the baselines are established, changes are not required to be formally controlled by the Perform Integrated

Change Control process. Once the project is base-lined, change requests go through this process.

EQA ,Amhara Building Works Construction Enterprise

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!